Nuclear Power
Nuclear & Thermal Power
Tube installation, expansion, trimming and welding on stainless steel and titanium condensers of 300 MW, 600 MW and 1,000 MW units for dozens of power construction companies. Nuclear references include Tianwan, Changjiang, Qinshan and Fangchenggang.

Why power plants call us in
- Leaking condenser tubes. Vibration, erosion or corrosion causes tube leaks that compromise condensate quality. Once too many tubes have been plugged, retubing is due.
- Lost heat transfer. Fouling and a rising plugging rate pull condenser vacuum down and hurt unit efficiency, so the tubes need cleaning or replacing.
- Tube material upgrades. Converting a copper alloy condenser to stainless steel or titanium means a complete retube.
- New units. Once the condenser shell is assembled, the tubes have to be installed, expanded, trimmed, welded and hydro tested.
- Tight outage windows. Major and forced outages run to fixed dates, and the retube has to finish inside the window. We plan the schedule from the tube count, material and site conditions before mobilizing.
According to company records, retubing tools developed by Lanbo have been used for equipment installation and maintenance at more than 1,000 thermal power plants across China and at the Daya Bay and Qinshan nuclear power stations, and more than 60 Chinese power construction companies have used them for many years.
Relevant services
- 01Condenser RetubingFull or partial retubing of surface condensers whose tubes …
- 02Condenser Shell Assembly & New-Build InstallationShell fabrication, shell assembly and new-build condenser i…
- 03Tube Expansion (Titanium & Stainless Steel)Once the tubes are in, each one is expanded into its tubesh…
- 04Automatic Tube-to-Tubesheet Welding (Orbital TIG)Tube-to-tubesheet joints welded autogenously with the orbit…
- 05Heat Exchanger Cleaning, Leak Detection & Tubesheet CoatingTube-side and steam-side cleaning of condensers, heat excha…
- 06In-situ Turbine Journal RepairWhen a turbine journal has been scored by a bearing wiped t…
- 07Turbine Blade HVOF CoatingHigh-velocity oxy-fuel (HVOF) spraying of tungsten carbide–…
Featured projects

Thermal Power
Condenser Retrofit at a Power Plant in Myanmar
Hangzhou Guoneng Turbine Engineering Co., Ltd. Quote for a similar job
Thermal Power
Luoyuan Bay Unit 2, Fuzhou: Condenser Steam-side Cleaning, Titanium Tubing & Welding
Harbin Shunyuan Power Plant Equipment Co., Ltd. Quote for a similar job
Nuclear Power
Tianwan Nuclear Power Plant Units 3 & 4: New-Build Condenser Tubing
Tianwan Nuclear Power Plant Quote for a similar job
Thermal Power
Lakvijaya Power Plant, Sri Lanka: 300 MW Condenser Retrofit
Harbin Turbine Auxiliary Equipment Engineering Co., Ltd. (Lakvijaya Power Plant, Sri Lanka) Quote for a similar job
Thermal Power
Sanbaimen Power Plant, Raoping: 1,000 MW Condenser Tube Installation, Expansion & Welding
Guangdong Thermal Power Construction Co. (Unit 3, Sanbaimen Power Plant, Raoping, Guangdong) Quote for a similar jobProject references in this sector
| Industry | Project | Unit rating | Date | Tube material | Scope |
|---|---|---|---|---|---|
| Nuclear Power | MSR Painting and Pre-shipment Packing, A/B (Harbin Turbine) | 2 units | Dec 2025 | Packing | |
| Thermal Power | Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-07Q (Hangzhou Guoneng) | 3 units | Dec 2025 | Stainless steel | Retubing |
| Thermal Power | Gland Seal Tube-End Expanding, Facing & Welding (Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd.) | 2 units | Dec 2025 | Stainless steel | Retubing |
| Nuclear Power | CGN Lufeng Units 1, 2, 3 & 4 (Harbin Turbine Co., Ltd.) | Oct 2025 | Titanium | Cleaning, tube installation, expanding & welding | |
| Thermal Power | Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-05Q (Hangzhou Guoneng) | 6 units | Oct 2025 | Stainless steel | Retubing |
| Nuclear Power | LP Feedwater Heater Tube Installation and Cleaning, Changjiang Unit 3 (Harbin Turbine Co., Ltd.) | 4 units | Sep 2025 | Titanium | Tube installation and cleaning |
| Nuclear Power | LP Feedwater Heater Retubing, Changjiang Unit 3 (Harbin Turbine Co., Ltd.) | 4 units | Jul 2025 | Titanium | Retubing |
| Nuclear Power | Unit 1 Condenser Shell Assembly, CGN Lufeng (Harbin Turbine Co., Ltd.) | 1,000 MW | Jul 2025 | Titanium | Assembly |
| Thermal Power | Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-04Q (Hangzhou Guoneng) | 1 unit | Jul 2025 | Stainless steel | Retubing |
| Thermal Power | Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-03Q (Hangzhou Guoneng) | 6 units | May 2025 | Stainless steel | Retubing |
| Thermal Power | Gland Seal Tube-End Expanding, Facing & Welding (Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd.) | 1 unit | May 2025 | Stainless steel | Retubing |
| Thermal Power | Gland Seal Tube-End Expanding, Facing & Welding (Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd.) | 1 unit | Apr 2025 | Stainless steel | Retubing |
| Nuclear Power | Tube Installation, Expanding & Welding, Changjiang Unit 4 (Harbin Turbine, Huludao) | 2 units | Mar 2025 | Titanium | Assembly |
| Thermal Power | Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-02Q (Hangzhou Guoneng) | 2 units | Mar 2025 | Stainless steel | Retubing |
| Thermal Power | Stainless Steel Tube Expanding, Trimming & Welding, Unit 2, Shazhou Power Plant, Zhangjiagang (Suhua Construction Group Co., Ltd.) | 2 units | Mar 2025 | Stainless steel | Expanding, trimming & welding |
Planning a similar job? Send us your equipment details
Request a Quote