Condenser Shell Assembly & New-Build Installation

Shell fabrication, shell assembly and new-build condenser installation at thermal and nuclear plants – assembly platform, bottom plates, side walls and final assembly, followed by tube installation, expansion, trimming, welding and hydro testing.

Condenser shell assembly for Fangchenggang Nuclear Power Plant Unit 4

A surface condenser is made up mainly of the shell, tube bundles, hotwell and waterboxes. Our shell assembly scope covers fabricating and erecting the assembly platform, joining the bottom plates, fitting and welding the side walls, assembling the shell and final assembly of the condenser.

With the shell complete, the tubing work follows: installation, expansion, trimming, welding, dye penetrant testing (if specified) and the hydrostatic test. By our own records we have installed close to one hundred condensers in China; references include Tianwan Nuclear Power Plant Units 3 and 4 (1,000 MW) and shell assembly for Fangchenggang Nuclear Power Plant Unit 4.

Equipment and tube materials

  • Condenser shells for thermal and nuclear units
  • Tubing of new-build condensers
  • Titanium and stainless steel tubes

Don't see your equipment here? Ask us.

Work sequence

  1. Fabricate and erect the assembly platform
  2. Join the bottom plates
  3. Fit and weld the side walls
  4. Assemble the shell; final assembly
  5. Install, expand, trim and weld the tubes
  6. Dye penetrant testing if specified
  7. Hydrostatic test

Schedule

Depends on unit rating, condenser design, tube count and the main contractor's schedule; the contract sets the final dates.

Quality control

  • Work to the drawings and qualified welding procedures
  • Dye penetrant testing if specified
  • Hydrostatic test
  • Work records and documentation handed over

Photos

Related projects

10 projects listedSwipe to see all columns

Industry Project Unit rating Date Tube material Scope
Nuclear Power Unit 1 Condenser Shell Assembly, CGN Lufeng (Harbin Turbine Co., Ltd.) 1,000 MW Jul 2025 Titanium Assembly
Nuclear Power Tube Installation, Expanding & Welding, Changjiang Unit 4 (Harbin Turbine, Huludao) 2 units Mar 2025 Titanium Assembly
Nuclear Power Unit 4 Condenser Shell Assembly, Changjiang Nuclear Power Plant (Harbin Turbine Co., Ltd.) 1,000 MW Jan 2025 Titanium Assembly
Nuclear Power Shell Cleaning, Expanding, Trimming & Welding, Sanmen (Harbin Turbine Co., Ltd.) Nov 2023 Titanium Retubing
Thermal Power Condenser Tubesheet Installation & Welding, Units 1 & 2, Huadu Project (Guangdong Power Engineering Co., Ltd., China Energy Engineering Group) 2 units Mar 2022 Stainless steel New-build installation
Thermal Power Turbine Condenser Copper Tube Installation (Shougang Changzhi Iron & Steel Co., Ltd.) 3 units Mar 2022 Copper alloy Retubing
Thermal Power Condenser Tubesheet Installation & Welding, Huadu Project (Guangdong Power Engineering Co., Ltd., China Energy Engineering Group) 2 units Mar 2022 Stainless steel Cleaning, expanding, trimming, facing & welding
Thermal Power Titanium Tube Installation, Cleaning, Expanding, Trimming & Welding, Lingang and Fengxian, Shanghai (Shanghai Zhoule Marine Steel Structure Co., Ltd.) 2 units Jul 2021 Titanium New-build installation (Samsung project)
Thermal Power On-site Condenser Installation, Jiangyin (Hangzhou Guoneng Turbine Engineering Co., Ltd.) 2 × 350 MW Oct 2019 Stainless steel New-build installation (Siemens project)
Nuclear Power Unit 4 Condenser Shell Assembly, Fangchenggang (Shanghai Electric Power Generation Equipment Co., Ltd.) 1,000 MW Jan 2019 Titanium New-build installation

More projects

Troubleshooting guides

Guides on the Lanbo products website, with causes, step-by-step fixes and the tools for the job.

Planning a similar job? Send us your equipment details

Request a Quote