Boilers & District Heating Projects

Selected project references across nuclear and thermal power, desalination, petrochemical, boilers and heating, and HVAC. Filter by industry, type of work, year and tube material, or read about featured projects in detail.

Selected project references

Translated from our Chinese project records. Plant and client names are given as they were at the time of each project.

Reset

28 projects listedSwipe to see all columns

Project Unit rating Date Tube material Scope
On-site Condenser Installation, Baotou Aluminum Project 2 × 125 MW Oct 2017 Stainless steel New-build installation
On-site Condenser Installation, Xingneng Project (5 units) 5 units Oct 2017 Stainless steel New-build installation
Salaqi Power Plant Nov 2016 Retubing
Condenser Installation, Xingneng (Gujiao) Power Plant, Shanxi 80,000 m² Jun 2016 Stainless steel New-build installation
Baotou No. 2 Thermal Power Plant (Northern United Power) 300 MW Aug 2015 Stainless steel Retubing
Lube Oil Cooler Copper Tube Replacement, Unit 04, Nanjing Meishan Cogeneration Plant 100 MW Apr 2015 Copper alloy Retubing
Jinqiao 300 MW Condenser Project 300 MW Aug 2014 Stainless steel Expanding, trimming, facing & welding
Jiangsu Xielian Yixing Cogeneration Co., Ltd. 125 MW Jan 2007 Copper alloy Retubing
Donggang Cogeneration Plant, Jinzhou, Liaoning 200 MW Jan 2005 Stainless steel Retubing
Donggang Cogeneration Plant, Jinzhou 200 MW Oct 2004 Copper alloy Retubing
Huai'an Cogeneration Plant 12 MW Oct 2004 Copper alloy Retubing
Taiyuan First Cogeneration Plant 135 MW Jul 2004 Stainless steel Retubing
Shanxian Cogeneration Plant, Henan 50 MW May 2004 Stainless steel Retubing
Qingshan Cogeneration Plant, Hubei 100 MW Mar 2004 Copper alloy Retubing
Yixing Cogeneration Plant, Jiangsu 50 MW Feb 2004 Copper alloy Retubing
Fengcheng Cogeneration Plant, Liaoning 6 MW Oct 2003 Copper alloy Retubing
Taiyuan Second Cogeneration Plant, Shanxi 50 MW Mar 2003 Copper alloy Retubing
Wantong Cogeneration Plant, Yantai 25 MW Dec 2002 Copper alloy Retubing
Dongtang Group Cogeneration Plant, Dongguan 25 MW Jul 2002 Copper alloy Retubing
Dongtang Group Cogeneration Plant, Dongguan 12 MW Jun 2002 Copper alloy Retubing
Harbin Chemical Cogeneration Co., Ltd. 12 MW Jul 2001 Copper alloy Retubing
Unit 3, Liaohe Cogeneration Plant 50 MW Jun 2001 Copper alloy Retubing
Ogden Madian Cogeneration Plant, Taixing, Jiangsu 12 MW Dec 2000 Copper alloy Retubing
Jiangyuan Cogeneration Co., Ltd. 6 MW Dec 1999 Copper alloy Retubing
Xielian Cogeneration Plant, Yixing, Jiangsu 12 MW Aug 1999 Copper alloy Retubing
Chaoyang Cogeneration Plant, Liaoning 6 MW Mar 1999 Copper alloy Retubing
Xiangcheng Cogeneration Plant, Henan 12 MW Jun 1998 Copper alloy Retubing
Xiangcheng Cogeneration Plant, Henan 3 MW Jun 1998 Copper alloy Retubing
Request a quote

Send us your equipment details

Drawings or site photos help. We will go through the equipment, tube material and outage window with you, and send an engineer to site if an inspection is needed.

During our working hours (UTC+8) we usually reply within two hours.

+86 136 3706 9797
From page: Boilers & District Heating Projects

We use your details only to answer this inquiry and prepare a quotation. See our privacy notice.