Project facts
| Client / owner | Sinopec Yangzi Petrochemical Co., Ltd.; BASF-YPC Company Limited (Nanjing) |
|---|---|
| Industry | Petrochemical |
| Equipment | Surface condensers and turbine condensers |
| Rating / size | 12 MW, 50 MW and others |
| Tube material | Copper alloy, stainless steel |
| Project date | Several jobs, 2005–2022 |
| Result | Several condensers retubed during planned plant turnarounds. |
Yangzi Petrochemical entries in our project reference list:
- July 2005: condenser retubing at the Jiangsu Yangzi Petrochemical olefins plant (copper alloy tubes)
- August 2014: copper tube replacement on condenser E-EA215, ethylene unit, Yangzi Petrochemical olefins plant (12 MW)
- April 2015: retubing of three turbine condensers in the BCC unit at BASF-YPC, Nanjing (50 MW, stainless steel tubes)
- April 2022: copper tube replacement on E-EA1215 during the ethylene complex turnaround (Sinopec Yangzi Petrochemical)
Related services
Planning a similar job? Send us your equipment details
Request a Quote