# Yangzi Petrochemical: Ethylene Plant Condenser Retubing

- Industries: Petrochemical
- Client: Sinopec Yangzi Petrochemical Co., Ltd.; BASF-YPC Company Limited (Nanjing)
- Equipment: Surface condensers and turbine condensers
- Unit / size: 12 MW, 50 MW and others
- Tube material: Copper alloy, stainless steel
- Date: Several jobs, 2005–2022
- Result: Several condensers retubed during planned plant turnarounds.

Yangzi Petrochemical entries in our project reference list:

- July 2005: condenser retubing at the Jiangsu Yangzi Petrochemical olefins plant (copper alloy tubes)
- August 2014: copper tube replacement on condenser E-EA215, ethylene unit, Yangzi Petrochemical olefins plant (12 MW)
- April 2015: retubing of three turbine condensers in the BCC unit at BASF-YPC, Nanjing (50 MW, stainless steel tubes)
- April 2022: copper tube replacement on E-EA1215 during the ethylene complex turnaround (Sinopec Yangzi Petrochemical)

## Related services

- [Heat Exchanger Retubing & Bundle Replacement](https://www.heatexchangersolution.com/en/services/heat-exchanger-retubing/)

Web page: https://www.heatexchangersolution.com/en/projects/yangzi-petrochemical-retubing/

---
Contact Lanbo: +86 136 3706 9797 · Lanbo@hflanbo.com.cn · https://www.heatexchangersolution.com/en/contact/
