# Sanbaimen Power Plant, Raoping: 1,000 MW Condenser Tube Installation, Expansion & Welding

- Industries: Thermal Power
- Client: Guangdong Thermal Power Construction Co. (Unit 3, Sanbaimen Power Plant, Raoping, Guangdong)
- Equipment: Condenser
- Unit / size: 1,000 MW
- Tube material: Titanium
- Quantity: Nearly 40,000 tubes
- Duration: 15 days for expansion, trimming and welding
- Date: February 2009
- Result: Hydrostatic test passed on the first attempt, with no leaks.

In February 2009, Guangdong Thermal Power Construction Co. brought in Lanbo for tube installation, expansion, trimming and welding on the condenser of the 1,000 MW Unit 3 at Sanbaimen Power Plant in Raoping. Nearly 40,000 titanium tubes were expanded, trimmed, faced and welded in 15 days, and the condenser passed its hydrostatic test on the first attempt with no leaks.

These figures are for this project only. Schedules for other jobs depend on the tube count, tube material, site conditions and the outage window.

## Related services

- [Condenser Retubing](https://www.heatexchangersolution.com/en/services/condenser-retubing/)
- [Tube Expansion (Titanium & Stainless Steel)](https://www.heatexchangersolution.com/en/services/tube-expansion/)
- [Tube End Trimming & Facing](https://www.heatexchangersolution.com/en/services/tube-cutting-facing/)
- [Automatic Tube-to-Tubesheet Welding (Orbital TIG)](https://www.heatexchangersolution.com/en/services/tube-to-tubesheet-welding/)

Web page: https://www.heatexchangersolution.com/en/projects/raoping-1000mw-condenser/

---
Contact Lanbo: +86 136 3706 9797 · Lanbo@hflanbo.com.cn · https://www.heatexchangersolution.com/en/contact/