# Selected projects

Selected project records, grouped by industry. Columns: project, size, date, tube material, scope.

## Nuclear Power (39)

- MSR Painting and Pre-shipment Packing, A/B (Harbin Turbine) | 2 units | 2025年12月 | Packing
- CGN Lufeng Units 1, 2, 3 & 4 (Harbin Turbine Co., Ltd.) | 2025年10月 | Titanium | Cleaning, tube installation, expanding & welding
- LP Feedwater Heater Tube Installation and Cleaning, Changjiang Unit 3 (Harbin Turbine Co., Ltd.) | 4 units | 2025年9月 | Titanium | Tube installation and cleaning
- LP Feedwater Heater Retubing, Changjiang Unit 3 (Harbin Turbine Co., Ltd.) | 4 units | 2025年7月 | Titanium | Retubing
- Unit 1 Condenser Shell Assembly, CGN Lufeng (Harbin Turbine Co., Ltd.) | 1,000 MW | 2025年7月 | Titanium | Assembly
- Tube Installation, Expanding & Welding, Changjiang Unit 4 (Harbin Turbine, Huludao) | 2 units | 2025年3月 | Titanium | Assembly
- Unit 4 Condenser Shell Assembly, Changjiang Nuclear Power Plant (Harbin Turbine Co., Ltd.) | 1,000 MW | 2025年1月 | Titanium | Assembly
- Level Gauge Nozzle Welding (Dalian Huarui Heavy Industry Group Co., Ltd.) | 24 sets | 2025年1月 | Titanium | Nozzle welding
- LP Feedwater Heater Tube Pulling, Changjiang Unit 3, Hainan (Harbin Turbine) | 1 unit | 2024年12月 | Stainless steel | Tube pulling
- MSR Grit Blasting and Painting, Changjiang Nuclear Power Plant, Hainan (Harbin Turbine Co., Ltd.) | 2024年12月 | Titanium | Grit blasting & painting
- MSR Grit Blasting and Painting, Changjiang Nuclear Power Plant, Hainan (Harbin Turbine Co., Ltd.) | 2024年10月 | Titanium | Grit blasting & painting
- Tube Pulling, Yingcheng, Hubei (Harbin Turbine) | 2 units | 2024年9月 | Copper alloy | Tube pulling
- MSR Grit Blasting and Painting, Changjiang Nuclear Power Plant (Harbin Turbine Co., Ltd.) | 2024年3月 | Titanium | Retubing
- Shell Cleaning, Expanding, Trimming & Welding, Sanmen (Harbin Turbine Co., Ltd.) | 2023年11月 | Titanium | Retubing
- Lower Condenser Tube Expanding, Trimming & Welding, Haiyang Unit 3 (Harbin Turbine Co., Ltd.) | 1 unit | 2023年9月 | Titanium | Retubing
- Haiyang Units 3 & 4 / Sanmen Units 3 & 4 (Harbin Turbine Co., Ltd.) | 4 units | 2023年8月 | Titanium | Retubing
- EDG Heat Exchanger Tube Replacement, Outage 122 (Qinshan Nuclear Power Co., Ltd.) | 2023年4月 | Copper alloy | Retubing
- Baffle Plate Grinding and Cleaning, Units 3 & 4, Changjiang Nuclear Power Plant (Harbin Turbine Co., Ltd.) | 2 units | 2023年1月 | Titanium | Retubing
- Changjiang Nuclear Power Project (Harbin Turbine Co., Ltd.) | 2 units | 2022年5月 | Copper alloy | Retubing
- Titanium Tube Replacement, RCW Heat Exchanger 4, Unit 2, Qinshan Phase III (Third Qinshan Nuclear Power Co., Ltd.) | 1 unit | 2022年2月 | Copper alloy | Retubing
- EDG Heat Exchanger Tube Replacement, Outage 121, Qinshan Phase I (Qinshan Nuclear Power Co., Ltd.) | 1 unit | 2022年2月 | Copper alloy | Retubing
- EDG Retubing, Outage Q1-OT120 (Qinshan Nuclear Power Co., Ltd.) | 6 MW | 20 年 12 月 | Copper alloy | Retubing
- EDG Heat Exchanger Tube Repairs, Outage Q1-OT119 (Qinshan Nuclear Power Co., Ltd.) | 6 MW | 19年9月 | Copper alloy | Retubing
- Unit 4 Condenser Shell Assembly, Fangchenggang (Shanghai Electric Power Generation Equipment Co., Ltd.) | 1,000 MW | 19 年 1 月 | Titanium | New-build installation
- Qinshan Nuclear Power Co., Ltd. | 17年12月 | Copper alloy | Retubing
- Tianwan Nuclear Power Plant Unit 4 | 1,000 MW | 16年6月 | Titanium | Tube installation, expanding & welding
- Lakvijaya Power Plant, Sri Lanka | 300 MW | 15年7月 | Titanium | Retrofit
- Outage Q1-OT116, Qinshan Nuclear Power | 6 MW | 15年6月 | Copper alloy | Retubing
- Tianwan Nuclear Power Plant Unit 3 | 1,000 MW | 15年6月 | Titanium | Tube installation, expanding, trimming, facing & welding
- Outage R15, Qinshan Nuclear Power | 30 MW | 14年5月 | Copper alloy | Retubing
- Tube-to-Tubesheet Welding, Units 1 & 2, Changjiang Nuclear Power Plant, Hainan | 600 MW | 13年11月 | Titanium | Expanding, trimming, facing & welding
- Tube Expanding, Trimming & Facing, Units 1 & 2, Changjiang Nuclear Power Plant, Hainan | 600 MW | 13年11月 | Titanium | Expanding, trimming, facing & welding
- Vogtle Nuclear Power Plant, USA | 1,000 MW | 12年12月 | Titanium | Tube installation, expanding, trimming, facing & welding
- Haiyang Nuclear Power Plant Unit 1 | 1,000 MW | 12年3月 | Titanium | Expanding, trimming, facing & welding
- Qinshan Nuclear Power Co., Ltd. | 30 MW | 11年10月 | Copper alloy | Retubing
- Nanjing Baose Co., Ltd. | Heat exchanger | 09年5月 | Titanium | Retubing
- China Nuclear Industry 5th Construction Co. | Heat exchanger | 09年3月 | Copper alloy | Retubing
- Nanjing Baose Co., Ltd. | Heat exchanger | 09年3月 | Titanium | Retubing
- Third Qinshan Nuclear Power Co. | Heat exchanger | 08年11月 | Titanium | Retubing

## Thermal Power (278)

- Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-07Q (Hangzhou Guoneng) | 3 units | 2025年12月 | Stainless steel | Retubing
- Gland Seal Tube-End Expanding, Facing & Welding (Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd.) | 2 units | 2025年12月 | Stainless steel | Retubing
- Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-05Q (Hangzhou Guoneng) | 6 units | 2025年10月 | Stainless steel | Retubing
- Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-04Q (Hangzhou Guoneng) | 1 unit | 2025年7月 | Stainless steel | Retubing
- Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-03Q (Hangzhou Guoneng) | 6 units | 2025年5月 | Stainless steel | Retubing
- Gland Seal Tube-End Expanding, Facing & Welding (Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd.) | 1 unit | 2025年5月 | Stainless steel | Retubing
- Gland Seal Tube-End Expanding, Facing & Welding (Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd.) | 1 unit | 2025年4月 | Stainless steel | Retubing
- Tube-End Cleaning, Installation, Expanding, Facing & Welding, WB2025-LB-02Q (Hangzhou Guoneng) | 2 units | 2025年3月 | Stainless steel | Retubing
- Stainless Steel Tube Expanding, Trimming & Welding, Unit 2, Shazhou Power Plant, Zhangjiagang (Suhua Construction Group Co., Ltd.) | 2 units | 2025年3月 | Stainless steel | Expanding, trimming & welding
- Tube Installation, Expanding, Trimming, Facing & Welding, WB2025-LB-01Q (Hangzhou Guoneng) | 5 units | 2025年2月 | Stainless steel | Retubing
- Gland Seal Expanding, Trimming & Welding (Ningbo Hengfei Machinery) | 1 unit | 2024年12月 | Stainless steel | Retubing
- Myanmar Condenser Retrofit (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 1 unit | 2024年11月 | Stainless steel | Retubing
- Tube-End Welding (Jiaxing Max Machinery Manufacturing Co., Ltd.) | 2 units | 2024年10月 | Stainless steel | Retubing
- Gland Seal Expanding, Trimming & Welding (Ningbo Hengfei Machinery) | 2 units | 2024年10月 | Stainless steel | Retubing
- Cleaning, Tube Installation, Expanding & Facing (Hangzhou Chuangbo Machinery Equipment Co., Ltd.) | 1 unit | 2024年9月 | Copper alloy | Retubing
- Tube Cleaning, Expanding, Trimming, Facing & Welding (Jiaxing Max Machinery Manufacturing Co., Ltd.) | 2 units | 2024年8月 | Stainless steel | Retubing
- Gland Seal Expanding, Trimming & Welding (Ningbo Hengfei Machinery) | 1 unit | 2024年7月 | Stainless steel | Retubing
- Tube Installation, Expanding, Facing & Welding (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 10 units | 2024年6月 | Stainless steel | Retubing
- Gland Seal Expanding, Trimming & Welding, at Lanbo's Works (Ningbo Hengfei Machinery) | 1 unit | 2024年6月 | Stainless steel | Retubing
- Tube Expansion (Jiaxing Max Machinery Manufacturing Co., Ltd.) | 1 unit | 2024年5月 | Copper alloy | Retubing
- Tube Installation, Expanding, Facing & Welding (Hangzhou Guoneng Turbine Engineering) | 2 units | 2024年4月 | Stainless steel | Retubing
- Strength Expansion of Mechanical Seal Fluid Coolers (Yantai Moon Pressure Vessel Co., Ltd.) | 1 unit | 2024年4月 | Stainless steel | Retubing
- Expanding, Trimming, Facing & Welding – Baffle Plate and End Plate Expansion (Jiaxing Max Machinery Manufacturing Co., Ltd.) | 2 units | 2024年3月 | Stainless steel | Retubing
- Expanding, Trimming, Facing & Welding (Jiaxing Max Machinery Manufacturing Co., Ltd.) | 2 units | 2024年3月 | Stainless steel | Retubing
- Tube Installation, Expanding, Facing & Welding (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 10 units | 2024年2月 | Copper alloy | Retubing
- Condenser Retubing, Ningbo Yisheng (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 1 unit | 2024年1月 | Stainless steel | Retubing
- Tube Cleaning, Expanding, Trimming, Facing & Welding (Zhejiang Hangzhen Intelligent Technology Co., Ltd.) | 2023年10月 | Stainless steel | Retubing
- Unit 1, Weiqiao First Power Plant (Shandong Weijian Construction Engineering Co., Ltd.) | 1 unit | 2023年8月 | Copper alloy, stainless steel | Retubing
- Tube-End Expansion (Yantai Moon Pressure Vessel Co., Ltd.) | 4 units | 2023年7月 | Stainless steel | Retubing
- Shop Tube Installation, Expanding & Welding (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 8 units | 2023年6月 | Copper alloy | Retubing
- Retubing at Shanghai SECCO (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 2023年6月 | Copper alloy | Retubing
- Gland Seal Expanding, Trimming & Welding (Ningbo Hengfei Machinery Technology Co., Ltd.) | 2 units | 2023年3月 | Stainless steel | Retubing
- Heat Exchanger Tube Replacement, Jiangsu Sailboat Petrochemical (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 2023年2月 | Copper alloy | Retubing
- Shop Tube Installation, Expanding & Welding (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 30 units | 2023年1月 | Copper alloy | Retubing
- Condenser Tubing Work (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 11 units | 2023年1月 | Copper alloy | Retubing
- Expanding, Trimming, Facing & Welding (Jiaxing Max Machinery Manufacturing Co., Ltd.) | 2 units | 2022年12月 | Stainless steel
- Lube Oil Cooler Expanding, Facing & Welding (Ningbo Chuangli Hydraulic Machinery Co., Ltd.) | 1 unit | 2022 年12 月 | Stainless steel | Retubing
- Gland Seal Expanding, Facing & Welding (Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd.) | 2 units | 2022年12月 | Stainless steel | Retubing
- Expanding, Trimming & Facing (Jiaxing Max Machinery Manufacturing Co., Ltd.) | 1 unit | 2022年11月 | Stainless steel | Retubing
- Titanium Condenser Tubes: Cleaning, Expanding, Trimming & Facing (Zhejiang Hangzhen Intelligent Technology Co., Ltd.) | 1 unit | 2022年10月 | Titanium | Retubing
- Tube-End Seal Welding & Strength Expansion (Zhejiang Hangzhen Intelligent Technology Co., Ltd.) | 1 unit | 2022年10月 | Stainless steel | Retubing
- Expanding, Trimming & Facing (Jiaxing Max Machinery Manufacturing Co., Ltd.) | 1 unit | 2022年10月 | Stainless steel | Retubing
- Gland Seal Expanding, Facing & Welding (Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd.) | 1 unit | 2022年9月 | Stainless steel | Retubing
- Titanium Condenser Tubes: Cleaning, Expanding, Trimming, Facing & Welding (Zhejiang Hangzhen Intelligent Technology Co., Ltd.) | 2 units | 2022年9月 | Stainless steel | Retubing
- Tube-End Expanding, Trimming, Facing & Welding (Liyang Yuzheng Machinery Manufacturing Co., Ltd.) | 1 unit | 2022年9月 | Stainless steel | Retubing
- Titanium Condenser Tubes: Cleaning, Expanding, Trimming, Facing & Welding (Zhejiang Hangzhen Intelligent Technology Co., Ltd.) | 2 units | 2022年8月 | Titanium | Retubing
- Titanium Condenser Tubes: Cleaning, Expanding, Trimming, Facing & Welding (Zhejiang Hangzhen Intelligent Technology Co., Ltd.) | 1 unit | 2022年7月 | Titanium | Retubing
- Tube-End Strength Expansion & Seal Welding (Ningbo Huayi Industry & Trade Co., Ltd.) | 1 unit | 2022年6月 | Stainless steel | Retubing
- Retubing Project, Ningbo Yisheng (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 1 unit | 2022年6月 | Copper alloy | Retubing
- Condenser Retubing, Units 1 & 2, Huji Power Plant (Binzhou Lyuneng Cogeneration Co., Ltd.) | 2 units | 2022年5月 | Stainless steel | Retubing
- Condenser Copper Tube Replacement, Units 1, 2 & 3, Yangxin Power Plant (Binzhou Lyutong Cogeneration Co., Ltd.) | 3 units | 2022年5月 | Stainless steel | Retubing
- Gland Seal Expanding, Facing & Welding (Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd.) | 1 unit | 2022年5月 | Stainless steel | Retubing
- Condenser Tubesheet Installation & Welding, Units 1 & 2, Huadu Project (Guangdong Power Engineering Co., Ltd., China Energy Engineering Group) | 2 units | 2022年3月 | Stainless steel | New-build installation
- Turbine Condenser Copper Tube Installation (Shougang Changzhi Iron & Steel Co., Ltd.) | 3 units | 2022 年 3 月 | Copper alloy | Retubing
- Condenser Tubesheet Installation & Welding, Huadu Project (Guangdong Power Engineering Co., Ltd., China Energy Engineering Group) | 2 units | 2022 年 3 月 | Stainless steel | Cleaning, expanding, trimming, facing & welding
- Condenser Tube Installation, Expanding, Facing & Welding (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 1 unit | 2022年1月 | Copper alloy | Retubing
- Tube Installation, Expanding, Trimming & Welding (Changshu Antong Complete Machinery & Equipment Manufacturing Co., Ltd.) | 2 units | 2022年1月 | Stainless steel | Retubing
- Lube Oil Cooler Expanding, Facing & Welding (Ningbo Chuangli Hydraulic Machinery Co., Ltd.) | 2 units | 2022年1月 | Stainless steel | Retubing
- Condenser Retubing, Tianjin Project (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 2 units | 2021年9月 | Titanium, stainless steel | Retubing
- Condenser Retubing, Pinghu, Jiaxing (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 2 units | 2021年8月 | Titanium, stainless steel | Retrofit and retubing
- Titanium Tube Installation, Cleaning, Expanding, Trimming & Welding, Lingang and Fengxian, Shanghai (Shanghai Zhoule Marine Steel Structure Co., Ltd.) | 2 units | 2021 年 7 月 | Titanium | New-build installation (Samsung project)
- Unit 2 Condenser, Luoyuan Bay, Fuzhou: Steam-side Cleaning, Titanium Tube Installation, Tube Cleaning, Expanding, Trimming & Welding (Harbin Shunyuan Power Plant Equipment Co., Ltd.) | 3 units | 2021年6月 | Titanium | Tube installation, tube cleaning, expanding, trimming & welding
- Inspection and Maintenance (Sinopec Shanghai Petrochemical Co., Ltd.) | 2 units | 2021年5月 | Copper alloy | Retubing
- On-site Condenser Installation, Jiangyin (Hangzhou Guoneng Turbine Engineering Co., Ltd.) | 2 × 350 MW | 2019 年 10 月 | Stainless steel | New-build installation (Siemens project)
- On-site Condenser Installation, Huairen Project, Shanxi (Dongfang Turbine Co., Ltd., Dongfang Electric) | High back-pressure unit | 18年12月 | Stainless steel | New-build installation
- On-site Turbine Condenser Installation, Units 1 & 2, China Coal Datun Project (Dongfang Turbine Co., Ltd., Dongfang Electric) | 2 × 350 MW | 18年12月 | Stainless steel | New-build installation
- On-site Condenser Installation, Huadian Junliangcheng Project (Dongfang Turbine Co., Ltd., Dongfang Electric) | 350 MW | 18 年 10 月 | Stainless steel | New-build installation
- Spot Replacement of Condenser Copper Tubes | 17年12月 | Copper alloy | Retubing
- On-site Turbine Condenser Installation, Units 1 & 2, Shenhua Jiangyou Tianming Project (Dongfang Turbine Co., Ltd., Dongfang Electric) | 2 × 1,000 MW | 17年11月 | Stainless steel | New-build installation
- On-site Condenser Installation, Baotou Aluminum Project (Dongfang Turbine Co., Ltd., Dongfang Electric) | 2 × 125 MW | 17年10月 | Stainless steel | New-build installation
- On-site Condenser Installation, Xingneng Project, 5 units (Dongfang Turbine Co., Ltd., Dongfang Electric) | 5 units | 17年10月 | Stainless steel | New-build installation
- Stainless Steel Condenser Tubes: Cleaning, Expanding, Trimming, Facing & Automatic TIG Welding | 17年8月 | Stainless steel | Cleaning, expanding, trimming, facing & automatic TIG welding
- Qinhuangdao Hongxing Iron & Steel Co., Ltd. | 17年5月 | Stainless steel | Cleaning, expanding, trimming, facing & automatic TIG welding
- Ningxia Power Plant | 1,000 MW | 17年4月 | Stainless steel | Cleaning, expanding, trimming, facing & automatic TIG welding
- Nanjing Meishan Power Generation Co., Ltd. (Baosteel Group) | 17年3月 | Copper alloy | Retubing
- Hangzhou Guoneng Turbine Engineering Co., Ltd. | 17年3月 | Stainless steel | Cleaning, expanding, trimming, facing & welding
- Hangzhou Guoneng Turbine Engineering Co., Ltd. | 17年2月 | Stainless steel | Cleaning, expanding, trimming, facing & welding
- Jiangsu Yangzhou Power Generation Co., Ltd., Project 2 | 630 MW | 17年1月 | Stainless steel | Cleaning, expanding, trimming, facing & welding
- Hangzhou Guoneng Turbine Engineering Co., Ltd. | 100 MW | 16年10月 | Stainless steel | Tube installation, expanding & facing
- Jiangsu Yangzhou Power Generation Co., Ltd., Project 1 | 630 MW | 16年10月 | Stainless steel | Cleaning, expanding, trimming, facing & welding
- Datang Jiangyan Project | 50 MW | 16年9月 | Stainless steel | Automatic TIG tube-end welding
- Dongying Power Plant, Shanxi | 300 MW | 16年8月 | Copper alloy | Retubing
- Unit 1, Xingtai Power Plant, Hebei | 300 MW | 16年6月 | Stainless steel | Cleaning, expanding, trimming, facing & welding
- Unit 2, Fangchenggang Power Plant, Guangxi | 600 MW | 16年5月 | Titanium | Expanding, trimming, facing & welding
- Unit 2, Xingtai Power Plant, Hebei | 300 MW | 16年5月 | Stainless steel | Cleaning, expanding, trimming, facing & welding
- Unit 1, Fangchenggang Power Plant, Guangxi | 600 MW | 16年3月 | Titanium | Expanding, trimming & welding
- Changshu High Pressure Vessel Manufacturing Co., Ltd. | 25 MW | 16年1月 | Stainless steel | Expanding, trimming, facing & welding
- SDIC Qinzhou Port Power Plant, Guangxi | 1,000 MW | 15年10月 | Titanium | Expanding, trimming, facing & welding
- Xingneng Power Plant, Shanxi | 120 MW | 15年9月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 2 Project, Yixing Power Plant, Jiangsu | 135 MW | 15年1月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 1, Nanjing Meishan Energy | 50 MW | 14年6月 | Copper alloy | Retubing
- Unit 2 Condenser Project, Baosteel Zhanjiang, Guangdong | 150 MW | 14年6月 | Titanium | Expanding, trimming, facing & welding
- Unit 1 Condenser Project, Zhanjiang | 150 MW | 14年5月 | Titanium | Expanding, trimming, facing & welding
- Unit 2 Cleaning, Expanding & Trimming, Gaolan Port | 135 MW | 14年4月 | Titanium | Expanding, trimming, facing & welding
- Changshu High Pressure Vessel Manufacturing Co., Ltd. | 12 MW | 14年3月 | Stainless steel | Expanding, trimming, facing & welding
- Condenser Leak Repair, Unit 5, Dezhou Power Plant | 700 MW | 14年2月 | Copper alloy | Tube-end coating
- Tube-to-Tubesheet Welding, Units 1 & 2, Dazhou Power Plant, Sichuan | 150 MW | 13年12月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 1 Installation, Gaolan Port Power Plant, Zhuhai | 135 MW | 13年12月 | Titanium | Expanding, trimming, facing & welding
- Unit 2 Installation, Hengqin Island Power Plant, Zhuhai | 50 MW | 13年11月 | Titanium | Expanding, trimming, facing & welding
- Unit 2 Retrofit, Zhangjiakou Power Plant | 300 MW | 13年10月 | Stainless steel | Retrofit
- Unit 11 Retrofit, Longhua Power Plant, Jilin | 200 MW | 13年10月 | Stainless steel | Retrofit
- Unit 2 Retrofit, Qingdao Power Plant | 330 MW | 13年9月 | Titanium | Retrofit
- Shaanxi Yulin Future Energy Project, 3 units | 150 MW | 13年9月 | Turbine exhaust system | Installation
- Unit 1 Installation, Hengqin Island Power Plant, Zhuhai | 50 MW | 13年7月 | Titanium | Expanding, trimming, facing & welding
- Linyi Power Plant, Shandong | 330 MW | 13年6月 | Stainless steel | Expanding, trimming, facing & welding
- Xiasha Power Plant, Hangzhou | 50 MW | 13年3月 | Stainless steel | Expanding, trimming, facing & welding
- Wujiang Beishe Cogeneration Co., Ltd. | 50 MW | 13年3月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 2, Huaneng Jinling Power Plant, Nanjing | 50 MW | 13年1月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 1, Huaneng Jinling Power Plant, Nanjing | 50 MW | 12年11月 | Stainless steel | Expanding, trimming, facing & welding
- Nanjing Meishan Energy Co., Ltd. Project | 50 MW | 12年10月 | Copper alloy | Retubing
- Datang Cogeneration Welding Project | 50 MW | 12年10月 | Stainless steel | Tube installation, expanding, trimming, facing & welding
- Unit 2, Dawang, Zhaoqing, Guangdong | 60 MW | 12年9月 | Stainless steel | Tube installation, expanding, trimming, facing & welding
- Cogeneration Plant, Changzhou Zhongtian Iron & Steel | 50 MW | 12年8月 | Stainless steel | Expanding, trimming, facing & welding
- Tube Welding, Unit 6, Heshuyuan Power Plant, Meizhou, Guangdong | 300 MW | 12年7月 | Stainless steel | Expanding, trimming, facing & welding
- Baoqing Coal-fired Power Plant | 600 MW | 12年6月 | Stainless steel | Expanding, trimming, facing & welding
- Tube Welding, Unit 5, Heshuyuan Power Plant, Meizhou, Guangdong | 300 MW | 12年4月 | Stainless steel | Expanding, trimming, facing & welding
- Nanjing Meishan Energy Co. | 50 MW | 12年3月 | Copper alloy | Retubing
- Unit 3, Dagang Power Plant, Tianjin | 328.5 MW | 12年2月 | Copper alloy | Retubing
- Unit 4, Tianjin Dagang Guang'an Jinneng Power Generation Co., Ltd. | 200 MW | 12年 | Copper alloy | Retubing
- Cogeneration Plant, Qilu Petrochemical | 60 MW | 11年7月 | Stainless steel | Retrofit
- Unit 2, Sanshui Hengyi Power Plant | 600 MW | 11年5月 | Stainless steel | Expanding, trimming, facing & welding
- Cogeneration Plant, Nanjing Meishan Iron & Steel Co. | 50 MW | 11年4月 | Copper alloy | Retubing
- Sheyang Port Project Office | 600 MW | 11年1月 | Titanium | Retubing technical supervision
- Unit 4, Shanwei Power Plant Phase I | 660 MW | 10年12月 | Titanium | Installation
- Yong'an Power Plant Project Office, Fujian | 300 MW | 10年10月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 3, Shanwei Power Plant Phase I | 660 MW | 10年07月 | Titanium | Expanding, trimming, facing & welding
- Yueyang Power Plant Project Office | 600 MW | 10年06月 | Titanium | Expanding, trimming, facing & welding
- Unit 6 Installation, Yunfu Power Plant C (Guangdong Thermal Power Engineering Corp.) | 330 MW | 10年03月 | Stainless steel | Installation
- Unit 5 Installation, Yunfu Power Plant C (Guangdong Thermal Power Engineering Corp.) | 330 MW | 09年11月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 2, Yangcheng Power Plant | 150 MW | 09年10月 | Stainless steel | Expanding, trimming, facing & welding
- Rizhao Power Plant | 600 MW | 09年10月 | Titanium | Titanium tube-end re-expansion & welding
- Daya Bay Cogeneration Plant Phase I, Huizhou | 330 MW | 09年8月 | Titanium | Installation; expanding, trimming & welding
- Unit 1, Yangcheng Power Plant | 150 MW | 09年7月 | Stainless steel | Expanding, trimming, facing & welding
- Baiyanghe Power Plant, Shandong | 300 MW | 09年5月 | Stainless steel | Expanding, trimming, facing & welding
- Baiyanghe Power Plant, Shandong | 300 MW | 09年5月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 3, Sanbaimen Power Plant | 1,000 MW | 09年2月 | Titanium | Expanding, trimming, facing & welding
- Unit 1, Yingkou Power Plant, Liaoning | 320 MW | 08年11月 | Copper alloy | Retubing
- Unit 4, Cogeneration Plant, Sinopec Qilu | 50 MW | 08年10月 | Stainless steel | Retrofit
- Unit 2, Putian Gas-fired Power Plant, Fujian | 350 MW | 08年10月 | Titanium | Expanding, trimming, facing & welding
- Jingyuan Power Plant, Kaifeng, Henan | 600 MW | 08年9月 | Stainless steel | Expanding, trimming, facing & welding
- Yuhua Power Plant, Shijiazhuang, Hebei | 300 MW | 08年8月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 3, Cogeneration Plant, Sinopec Qilu | 50 MW | 08年5月 | Stainless steel | Retrofit
- Rizhao Project Office | 600 MW | 08年5月 | Titanium | Expanding, trimming, facing & welding
- Unit 2, Cogeneration Plant, Sinopec Qilu | 50 MW | 08年3月 | Stainless steel | Retrofit
- Unit 1, Putian Gas-fired Power Plant, Fujian | 350 MW | 08年3月 | Titanium | Expanding, trimming, facing & welding
- Dezhou Power Plant, Huaneng International | 300 MW | 08年2月 | Copper alloy | Retubing
- Maocun Power Plant, Xuzhou, Jiangsu | 200 MW | 07年12月 | Stainless steel | Retrofit
- Wantou Power Plant, Yangzhou | 200 MW | 07年11月 | Copper alloy | Retubing
- Liaocheng Power Plant, Shandong Zhonghua Power | 600 MW | 07年11月 | Copper alloy | Retubing
- Zhongtai Project Office, SEPCOIII | 135 MW | 07年11月 | Stainless steel | Expanding, trimming, facing & welding
- Yingkou Power Plant, Liaoning, Huaneng International | 60 MW | 07年11月 | Copper alloy | Retubing
- Zhongtai Project Office, Shandong | 135 MW | 07年11月 | Stainless steel | Expanding, trimming, facing & welding
- Shanxi Shentou Power Generation Co., Ltd. | 200 MW | 07年10月 | Copper alloy | Retubing
- Matou Power Plant, Hebei | 200 MW | 07年10月 | Stainless steel | Retrofit
- Zhenjiang Suyuan Jiandian Power Equipment Engineering Co., Ltd. | 2 × 60 MW | 07年09月 | Copper alloy
- Jiangxi Jiujiang Power Generation Co., Ltd. | 200 MW | 07年09月 | Stainless steel | Retrofit
- Liaoning Qinghe Power Generation Co., Ltd. | 200 MW | 07年08月 | Stainless steel | Retrofit
- Yankuang Nantun Power Plant, Shandong | 2 × 50 MW | 07年07月 | Stainless steel | Retrofit
- Changsha Power Plant, Hunan | 600 MW | 07年07月 | Stainless steel | Expanding, trimming, facing & welding
- Yuhuan Power Plant, Zhejiang | 1,000 MW | 07年06月 | Titanium | Expanding, trimming, facing & welding
- Hunan Jinzhushan Power Generation Co., Ltd. | 125 MW | 07年05月 | Stainless steel | Retrofit
- Shanxi Shentou Power Generation Co., Ltd. | 200 MW | 07年04月 | Copper alloy | Retubing
- Yifa Cogeneration Plant, Shenxian, Shandong | 12 MW | 07年04月 | Copper alloy | Retubing
- Zouxian Power Plant, Shandong | 300 MW | 07年03月 | Copper alloy | Retubing
- Yingkou Power Plant, Liaoning, Huaneng International | 60 MW | 07年03月 | Super stainless steel | Retubing
- Guixi Thermal Power Plant, Jiangxi | 125 MW | 07年03月 | Stainless steel | Retrofit
- Yangcheng Power Plant, Shanxi | 600 MW | 07年03月 | Stainless steel | Expanding, trimming, facing & welding
- Zouxian Power Plant, Shandong | 300 MW | 07年02月 | Copper alloy | Retubing
- Chaoyang Hongwen Cogeneration Co., Ltd. | 6 MW | 07年02月 | Copper alloy | Retubing
- Datang Huainan Luohe Power Plant | 300 MW | 07年02月 | Stainless steel | Retrofit
- Shanxi Shentou Power Generation Co., Ltd. | 220 MW | 07年01月 | Copper alloy | Retubing
- Unit 2, Maocun Power Plant, Xuzhou, Jiangsu | 220 MW | 06年12月 | Stainless steel | Retrofit
- Datang Huainan Tianjia'an Power Plant | 125 MW | 06年12月 | Stainless steel | Retrofit
- Huangdao Power Plant, Shandong | 660 MW | 06年12月 | Titanium | Expanding, trimming, facing & welding
- Liaocheng Power Plant, Shandong Zhonghua Power Co., Ltd. | 600 MW | 06年11月 | Copper alloy | Retubing
- Zhenhai Refining & Chemical Maintenance and Installation Co. | Lube oil cooler | 06年10月 | Copper alloy | Retubing
- Zouxian Power Plant, Shandong | 1,000 MW | 06年10月 | Stainless steel | Expanding, trimming, facing & welding
- Yingkou Power Plant, Liaoning, Huaneng International | Feed-pump turbine | 06年09月 | Super stainless steel | Expanding, trimming, facing & welding
- Yingkou Power Plant, Liaoning, Huaneng International | Feed-pump turbine | 06年09月 | Super stainless steel | Expanding, trimming, facing & welding
- Qinzhou Power Plant, Guangxi | 600 MW | 06年09月 | Titanium | Expanding, trimming, facing & welding
- Dezhou Power Plant, Huaneng Power International, Inc. | 300 MW | 06年08月 | Copper alloy | Retubing
- Luohuang Power Plant, Chongqing | 600 MW | 06年08月 | Stainless steel | Expanding, trimming, facing & welding
- Unit 5, Wuhan Iron & Steel Co. | 25 MW | 06年07月 | Copper alloy | Retubing
- Qingshan Cogeneration Plant, Hubei | 50 MW | 06年06月 | Copper alloy | Retubing
- Feixian Power Plant, Shandong | 600 MW | 06年06月 | Stainless steel | Expanding, trimming, facing & welding
- Jiangsu Xinhai Power Generation Co., Ltd. | 200 MW | 06年05月 | Copper alloy | Retubing
- Jiangsu Zhongtian Cogeneration Co., Ltd. | 50 MW | 06年05月 | Copper alloy | Retubing
- Huayu Power Plant, Zhangjiagang | 125 MW | 06年05月 | Copper alloy | Retubing
- Penglai Power Plant, Shandong | 300 MW | 06年05月 | Titanium | Expanding, trimming, facing & welding
- Liaocheng Power Plant, Shandong | 300 MW | 06年05月 | Stainless steel | Expanding, trimming, facing & welding
- Jiangsu Jiangyuan Cogeneration Co., Ltd. | 6 MW | 06年04月 | Copper alloy | Retubing
- Zhengzhou Xinli Electric Power Co., Ltd. | 200 MW | 06年04月 | Copper alloy | Retubing
- Zouxian Power Plant, Shandong | 300 MW | 06年04月 | Copper alloy | Retubing
- Jiangsu Anbang Electrochemical Co., Ltd. | 15 MW | 06年03月 | Copper alloy | Retubing
- Jiangsu Xinhai Power Generation Co., Ltd. | 200 MW | 06年03月 | Copper alloy | Retubing
- Yingkou Power Plant, Liaoning, Huaneng | 6 MW | 06年03月 | Copper alloy | Retubing
- Chongming Power Plant, Shanghai | 50 MW | 06年02月 | Copper alloy | Retubing
- Ma'anshan Power Plant, Anhui | 125 MW | 06年02月 | Stainless steel | Retrofit
- Unit 2, Wangqu Power Plant, Shanxi | 600 MW | 06年02月 | Titanium | Installation
- Huangdao Power Plant, Shandong | 660 MW | 06年01月 | Titanium | Installation
- Huayu Power Plant, Zhangjiagang | 125 MW | 05年12月 | Copper alloy | Retubing
- Xuzhou Power Plant, Jiangsu | 220 MW | 05年12月 | Stainless steel | Retrofit
- Penglai Power Plant, Shandong | 300 MW | 05年11月 | Titanium | Installation
- Unit 1, Wangqu Power Plant, Shanxi | 600 MW | 05年11月 | Titanium | Expanding, trimming, facing & welding
- Daba Power Plant, Ningxia | 300 MW | 05年10月 | Stainless steel | Retubing
- Jianbi Power Plant, Jiangsu | 300 MW | 05年10月 | Copper alloy | Retrofit
- Danhe Power Plant, Jiaozuo, Henan | 100 MW | 05年10月 | Stainless steel | Retrofit
- Liaocheng Power Plant, Shandong | 300 MW | 05年10月 | Stainless steel | Installation
- Yangluo Power Plant | 300 MW | 05年09月 | Stainless steel | Retubing
- Linyi Power Plant, Shandong | 125 MW | 05年09月 | Copper alloy | Retubing
- Daba Power Plant, Ningxia | 300 MW | 05年08月 | Stainless steel | Retubing
- Songyu Power Plant, Xiamen | 300 MW | 05年08月 | Titanium | Installation
- Baiyanghe Power Plant, Shandong, Huaneng | 125 MW | 05年07月 | Copper alloy | Retubing
- Jiangsu Yangzi Petrochemical Olefins Plant | Surface condenser | 05年07月 | Copper alloy | Retubing
- Shaoguan Power Plant, Guangdong | 200 MW | 05年06月 | Stainless steel | Retubing
- Jingmen Refinery (Wuhan) | 12 MW | 05年05月 | Copper alloy | Retubing
- Yangluo Power Plant | 300 MW | 05年05月 | Stainless steel | Retubing
- Baiyanghe Power Plant, Shandong | 125 MW | 05年05月 | Copper alloy | Retubing
- Chongming Power Plant, Shanghai | 50 MW | 05年05月 | Copper alloy | Retubing
- Qinghe Power Plant, Liaoning | 110 MW | 05年05月 | Stainless steel | Retrofit
- Sanmenxia Power Plant, Henan | 135 MW | 05年05月 | Stainless steel | Installation
- Dagang Power Plant, Tianjin | 250 MW | 05年04月 | Copper alloy | Retubing
- Beijing Jingneng Power Co., Ltd. | 200 MW | 05年03月 | Copper alloy | Retubing
- Jinshan Power Plant, Shenyang | 12 MW | 05年03月 | Copper alloy | Retubing
- Wuhu Power Plant, Anhui | 135 MW | 05年03月 | Stainless steel | Retrofit
- Yancheng Power Plant, Jiangsu | 135 MW | 05年02月 | Stainless steel | Retubing
- Tianjia'an Power Plant, Huainan | 125 MW | 05年02月 | Copper alloy | Retubing
- Ma'anshan Power Plant, Anhui | 125 MW | 05年01月 | Stainless steel | Retubing
- Jianbi Power Plant, Jiangsu | 2 × 6 MW | 04年12月 | Copper alloy | Retubing
- Jianbi Power Plant, Jiangsu | 300 MW | 04年12月 | Copper alloy | Retubing
- Dagang Power Plant, Tianjin | 250 MW | 04年11月 | Copper alloy | Retubing
- Jianbi Power Plant, Jiangsu | 100 MW | 04年11月 | Copper alloy | Retubing
- Ma'anshan Power Plant, Anhui | 125 MW | 04年10月 | Copper alloy | Retubing
- Beijing Jingneng Power Co., Ltd. | 200 MW | 04年09月 | Copper alloy | Retubing
- Shentou First Power Plant, Shanxi | 200 MW | 04年09月 | Copper alloy | Retubing
- Sulong Power Plant, Jiangyin | 300 MW | 04年08月 | Stainless steel | Retubing
- Xinhai Power Plant, Lianyungang | 200 MW | 04年07月 | Copper alloy | Retubing
- Heshan Power Plant, Guangxi | 2 × 75 MW | 04年07月 | Copper alloy | Retubing
- Shanghai Fittings Factory | 2 lube oil coolers | 04年06月 | Copper alloy | Retubing
- Xiagang Power Plant, Jiangyin, Jiangsu | 135 MW | 04年06月 | Copper alloy | Retubing
- Pingdingshan Yaomeng Power Generation Co., Ltd. | 300 MW | 04年05月 | Copper alloy | Retubing
- Xinhai Power Plant, Lianyungang | 220 MW | 04年05月 | Copper alloy | Retubing
- Jingdezhen Power Generation Co., Ltd. | 125 MW | 04年04月 | Copper alloy | Retubing
- Jianbi Power Plant, Jiangsu | 2 × 6 MW | 04年02月 | Copper alloy | Retubing
- Jianbi Power Plant, Jiangsu | 300 MW | 04年02月 | Copper alloy | Retubing
- Chongming Power Plant, Shanghai | 50 MW | 04年02月 | Copper alloy | Retubing
- Xiagang Power Plant, Jiangyin, Jiangsu | 135 MW | 04年02月 | Copper alloy | Retubing
- Shaoguan Power Plant, Guangdong | 200 MW | 03年12月 | Stainless steel | Retubing
- Jiangsu Yangzhou Power Generation Co., Ltd. | 200 MW | 03年12月 | Copper alloy | Retubing
- Donggang Power Plant, Jinzhou, Liaoning | 200 MW | 03年11月 | Copper alloy | Retubing
- Donggang Power Plant, Jinzhou, Liaoning | 200 MW | 03年10月 | Copper alloy | Retubing
- Unit 7, Heshan Power Plant, Guangxi | 100 MW | 03年09月 | Copper alloy | Retubing
- Laibin Power Plant, Guangxi | 125 MW | 03年09月 | Copper alloy | Retubing
- Shaoguan Power Plant, Guangdong | 125 MW | 03年08月 | Copper alloy | Retubing and pipework cleaning
- Unit 8, Heshan Power Plant, Guangxi | 100 MW | 03年07月 | Copper alloy | Retubing
- Unit 4, Tianjia'an Power Plant, Huainan, Anhui | 300 MW | 03年05月 | Copper alloy | Retubing
- Luneng Zhangqiu Power Plant, Shandong | 135 MW | 03年05月 | Stainless steel | Retubing
- Unit 4, Wuhan Iron & Steel Co. | 25 MW | 03年04月 | Copper alloy | Retubing
- Xinxiang Thermal Power Plant, Henan | 200 MW | 03年04月 | Stainless steel | Retubing
- Unit 8, Heshan Power Plant, Guangxi | 100 MW | 03年02月 | Copper alloy | Retubing
- Unit 3, Xinxiang Thermal Power Plant, Henan | 200 MW | 02年10月 | Stainless steel | Retubing
- Weifang Power Plant, Shandong | 2 coolers, 300 MW unit | 02年10月 | Copper alloy | Retubing
- Unit 6, Heshan Power Plant, Guangxi | 100 MW | 02年07月 | Copper alloy | Retubing
- Former Hanzhuang Power Plant | 3 lube oil coolers | 02年06月 | Copper alloy | Retubing
- Former Hanzhuang Power Plant | 2 × 25 MW | 02年05月 | Copper alloy | Retubing
- Unit 2, Liancheng Power Plant, Gansu | 100 MW | 02年03月 | Copper alloy | Retubing
- Unit 2, Xinxiang Thermal Power Plant, Henan | 200 MW | 01年11月 | Stainless steel | Retubing
- Unit 1, Liancheng Power Plant, Gansu | 100 MW | 01年10月 | Copper alloy | Retubing
- Laibin Power Plant, Guangxi | 125 MW | 01年05月 | Copper alloy | Retubing
- Unit 1, Xinxiang Thermal Power Plant, Henan | 200 MW | 00年10月 | Stainless steel | Retubing
- Hongyanchi Power Plant, Xinjiang | 25 MW | 00年10月 | Copper alloy | Retubing
- Chongming Power Plant, Shanghai | 50 MW | 98年10月 | Copper alloy | Retubing
- Jiayuguan Power Plant | 6 MW | 97年12月 | Copper alloy | Retubing
- Chongming Power Plant, Shanghai | 50 MW | 97年05月 | Copper alloy | Retubing
- Coal-fired Unit, Huangpu Power Plant | 施工中 | Expanding, trimming & welding
- On-site Condenser Installation, Huadian Junliangcheng Project | 1 unit | 施工中 | New-build installation
- On-site Turbine Condenser Installation, Units 1 & 2, China Coal Datun Project | 2 × 350 MW | 施工中 | Stainless steel | New-build installation
- On-site Turbine Condenser Installation, Units 1 & 2, Shenhua Jiangyou Tianming Project | 2 × 1,000 MW | 项目暂停 | Stainless steel | New-build installation

## Desalination (7)

- On-site Fabrication of a Desalination Evaporator (Jiangsu Qiulin Tenneng Equipment Co., Ltd.) | 12 effects | 2020 年 10 月 | Titanium | On-site fabrication
- Tianjin Dagang Power Generation Co., Ltd. | 1 unit | 2019年12月 | Copper alloy to titanium | Retrofit
- Hengli Petrochemical (Dalian) Desalination Project (ZCM (Suzhou) Heavy Equipment Co., Ltd.) | 55,000 t (2 sets) | 2019 年 8 月 | Titanium | New-build installation
- Titanium Tube-End Expansion, Desalination Evaporator Project 17-121 | 3 units | 18年7月 | Titanium | Tube-end expansion
- Titanium Tube-End Expansion on a Desalination Evaporator (Jiangsu Qiulin Tenneng Equipment Co., Ltd.) | 1 unit | 18年2月 | Titanium | Tube-end expanding & facing
- Desalination Plant Retubing (Shenhua Hebei Guohua Cangdong Power Co., Ltd.) | 17年6月 | Titanium | Retubing
- Desalination Project (Shanghai Electric) | 16年10月 | Titanium | Expanding, trimming & facing

## Petrochemical (18)

- Retubing at Jinshan (Sinopec Shanghai Petrochemical Co., Ltd.) | 1 unit | 2025年12月 | Copper alloy | Retubing
- Sinopec-SK (Wuhan) Petrochemical Project (Hangzhou Guoneng, WB2025-LB-06Q) | 1 unit | 2025年12月 | Stainless steel | Retubing
- Heat Exchanger Tube Supply and Retubing (Fujian Meide Petrochemical Co., Ltd.) | 1 unit | 2025年4月 | Copper alloy | Retubing
- Retubing at Zhejiang Petrochemical | 2023年11月 | Titanium | Retubing
- Condenser Retubing, Ethylene Unit 2 Turnaround, Olefins Division (Sinopec Shanghai Petrochemical Co., Ltd.) | 3 units | 2023年9月 | Copper alloy | Retubing
- Copper Tube Replacement on E-EA1215, Ethylene Complex Turnaround (Sinopec Yangzi Petrochemical Co., Ltd.) | 1 unit | 2022年4月 | Copper alloy | Retubing
- Inspection and Maintenance (Sinopec Shanghai Petrochemical Co., Ltd.) | 2 units | 2021年5月 | Copper alloy | Retubing
- Retubing of Three Turbine Condensers, BCC Unit, BASF-YPC, Nanjing | 50 MW | 15年4月 | Stainless steel | Retubing
- Unit 1 Condenser Overhaul (Tianjin Jinbin Petrochemical Equipment Co., Ltd.) | 50 MW | 14年11月 | Stainless steel | Tube-end coating
- Copper Tube Replacement on Condenser E-EA215, Ethylene Unit, Yangzi Petrochemical Olefins Plant | 12 MW | 14年8月 | Copper alloy | Retubing
- Cogeneration Division, Sinopec Baling Petrochemical | 15 MW | 08年2月 | Copper alloy | Retubing
- Nanjing Meishan Petrochemical | 12 MW | 07年11月 | Copper alloy | Retubing
- Sinopec Shanghai Petrochemical Co., Ltd. | Ethylene unit | 07年07月 | Copper alloy | Retubing
- Tianjin Petrochemical Cogeneration Plant | 50 MW | 05年04月 | Stainless steel | Retubing
- Tianjin Chemical Cogeneration Plant | 12 MW | 04年05月 | Stainless steel | Retubing
- Yueyang Petrochemical Cogeneration Plant | 12 MW | 04年03月 | Copper alloy | Retubing
- Yueyang Petrochemical Cogeneration Plant, Hunan | 12 MW | 01年05月 | Copper alloy | Retubing
- Hangzhou Guoneng Turbine Engineering Co., Ltd. | 15 units | 施工中 | Titanium, copper alloy, stainless steel | Cleaning, expanding, trimming, facing & welding

## Boilers & District Heating (28)

- On-site Condenser Installation, Baotou Aluminum Project | 2 × 125 MW | 17年10月 | Stainless steel | New-build installation
- On-site Condenser Installation, Xingneng Project (5 units) | 5 units | 17年10月 | Stainless steel | New-build installation
- Salaqi Power Plant | 16年11月 | Retubing
- Condenser Installation, Xingneng (Gujiao) Power Plant, Shanxi | 80,000 m² | 16年6月 | Stainless steel | New-build installation
- Baotou No. 2 Thermal Power Plant (Northern United Power) | 300 MW | 15年8月 | Stainless steel | Retubing
- Lube Oil Cooler Copper Tube Replacement, Unit 04, Nanjing Meishan Cogeneration Plant | 100 MW | 15年4月 | Copper alloy | Retubing
- Jinqiao 300 MW Condenser Project | 300 MW | 14年8月 | Stainless steel | Expanding, trimming, facing & welding
- Jiangsu Xielian Yixing Cogeneration Co., Ltd. | 125 MW | 07年01月 | Copper alloy | Retubing
- Donggang Cogeneration Plant, Jinzhou, Liaoning | 200 MW | 05年01月 | Stainless steel | Retubing
- Donggang Cogeneration Plant, Jinzhou | 200 MW | 04年10月 | Copper alloy | Retubing
- Huai'an Cogeneration Plant | 12 MW | 04年10月 | Copper alloy | Retubing
- Taiyuan First Cogeneration Plant | 135 MW | 04年07月 | Stainless steel | Retubing
- Shanxian Cogeneration Plant, Henan | 50 MW | 04年05月 | Stainless steel | Retubing
- Qingshan Cogeneration Plant, Hubei | 100 MW | 04年03月 | Copper alloy | Retubing
- Yixing Cogeneration Plant, Jiangsu | 50 MW | 04年02月 | Copper alloy | Retubing
- Fengcheng Cogeneration Plant, Liaoning | 6 MW | 03年10月 | Copper alloy | Retubing
- Taiyuan Second Cogeneration Plant, Shanxi | 50 MW | 03年03月 | Copper alloy | Retubing
- Wantong Cogeneration Plant, Yantai | 25 MW | 02年12月 | Copper alloy | Retubing
- Dongtang Group Cogeneration Plant, Dongguan | 25 MW | 02年07月 | Copper alloy | Retubing
- Dongtang Group Cogeneration Plant, Dongguan | 12 MW | 02年06月 | Copper alloy | Retubing
- Harbin Chemical Cogeneration Co., Ltd. | 12 MW | 01年07月 | Copper alloy | Retubing
- Unit 3, Liaohe Cogeneration Plant | 50 MW | 01年06月 | Copper alloy | Retubing
- Ogden Madian Cogeneration Plant, Taixing, Jiangsu | 12 MW | 00年12月 | Copper alloy | Retubing
- Jiangyuan Cogeneration Co., Ltd. | 6 MW | 99年12月 | Copper alloy | Retubing
- Xielian Cogeneration Plant, Yixing, Jiangsu | 12 MW | 99年08月 | Copper alloy | Retubing
- Chaoyang Cogeneration Plant, Liaoning | 6 MW | 99年03月 | Copper alloy | Retubing
- Xiangcheng Cogeneration Plant, Henan | 12 MW | 98年06月 | Copper alloy | Retubing
- Xiangcheng Cogeneration Plant, Henan | 3 MW | 98年06月 | Copper alloy | Retubing

## HVAC (5)

- Tube-End Expansion of Heat Transfer Tubes (Tongfang Energy Saving Equipment Co., Ltd.) | 17 units | 2025年6月 | Copper alloy | Retubing
- Copper Tube Removal and Reinstallation (Anhui Rongda Intelligent Building Construction Co., Ltd.) | 1 unit | 2025年3月 | Copper alloy | Retubing
- Tube-End Expansion of Heat Transfer Tubes (Tongfang Energy Saving Equipment Co., Ltd.) | 5 units | 2024年11月 | Copper alloy | Retubing
- Heat Transfer Tube Replacement with Stainless Steel, Datang Jinzhou Cogeneration Co. | 17年10月 | Stainless steel | Retubing
- Hefei Haihui Holiday Hotel Co., Ltd. | Maintenance | 11年1月 | Copper alloy | Retubing

Web page: https://www.heatexchangersolution.com/en/projects/

---
Contact Lanbo: +86 136 3706 9797 · Lanbo@hflanbo.com.cn · https://www.heatexchangersolution.com/en/contact/