About Us

Service Hotline

+86-13637066767+86-551-62884258
Performance
Your location:Home>About Us>Performance
Boiler Heating Chapter
 a.Tube Replacement

Project Name

Installed Capacity

Construction Period

Tube Material

Note

Salaqi Power Plant

/

2016.11

 

Tube Replacement

North China Power Baotou No. 2 Thermal Power Plant

300 MW

2015.8

Stainless Steel

Tube Replacement

 Copper Tube Replacement Project of Oil Cooler for Unit #04(Nanjing Meishan Thermal Power Plant)

100 MW

2015.4

Copper

Tube Replacement

 Jiangsu Xielian Yixing Thermal Power Co., Ltd.

125MW

2007.1

Copper

Tube Replacement

Donggang Thermal Power Plant, Jinzhou, Liaoning

200MW

2005.1

Stainless Steel

Tube Replacement

Donggang Thermal Power Plant, Jinzhou

200MW

2004.10

Copper

Tube Replacement

Huai’an Thermal Power Plant

12MW

2004.10

Copper

Tube Replacement

Taiyuan No.1 Thermal Power Plant

135MW

2004.7

Stainless Steel

Tube Replacement

Shanxian Thermal Power Plant, Henan

50MW

2004.5

Stainless Steel

Tube Replacement

Qingshan Thermal Power Plant, Hubei

100MW

2004.3

Copper

Tube Replacement

Yixing Thermal Power Plant, Jiangsu

50MW

2004.2

Copper

Tube Replacement

Fengcheng Thermal Power Plant, Liaoning

6MW

2003.10

Copper

Tube Replacement

Taiyuan No. 2 Thermal Power Plant, Shanxi

50MW

2003.3

Copper

Tube Replacement

Wantong Thermal Power Plant, Yantai

25MW

2002.12

Copper

Tube Replacement

Dongtang Group Thermal Power Plant, Dongguan

25MW

2002.7

Copper

Tube Replacement

Dongtang Group Thermal Power Plant, Dongguan

12MW

2002.6

Copper

Tube Replacement

Harbin Chemical Thermal Power Co., Ltd.

12MW

2001.7

Copper

Tube Replacement

Liaohe Thermal Power Plant Unit #3

50MW

2001.6

Copper

Tube Replacement

Ogden Madian Thermal Power Plant, Taixing, Jiangsu

12MW

2000.12

Copper

Tube Replacement

Jiangyuan Thermal Power Co., Ltd.

6MW

1999.12

Copper

Tube Replacement

Xielian Thermal Power Plant, Yixing, Jiangsu

12MW

1999.8

Copper

Tube Replacement

Chaoyang Thermal Power Plant, Liaoning

6MW

1999.3

Copper

Tube Replacement

Xiangcheng Thermal Power Plant, Henan

12MW

1998.8

Copper

Tube Replacement

Xiangcheng Thermal Power Plant, Henan

3MW

1998.6

Copper

Tube Replacement

b.Modification

Project Name

Installed Capacity

Construction Period

Tube Material

Note

On-site Installation of Condenser for Baotou Aluminium

units

(125MW)

2017.10

Stainless Steel

Modification

On-site Installation of Condenser for Xingneng Power

units

2017.10

Stainless Steel

Modification

Condenser Installation at Shanxi Xingneng (Gujiao) Power

80000㎡

2016.6

Stainless Steel

Modification

Jinqiao Condenser Project

300MW

2014.8

Stainless Steel

Modification

 

c.Installation of New Unit

 

Project Name

Installed Capacity

Construction Period

Tube Material

Note

 

 

 

 

 

 

Prev: HVAC Chapter Next: Nothing