a.Tube Replacement
Project Name |
Installed Capacity |
Construction Period |
Tube Material |
Note |
Seal Expansion, Cutting, and Welding-(Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd) | 1 unit | 2024.12 | Stainless Steel | Tube Replacement |
Myanmar Condenser Renovation Project(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
1 unit | 2024.11 | Stainless Steel | Tube Replacement |
Tube End Welding(Jiaxing Max Machinery Manufacturing Co., Ltd) |
2 units | 2024.10 | Stainless Steel | Tube Replacement |
Roll Expansion, Scraping, and Welding(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
10 units | 2024.6 | Stainless Steel | Tube Replacement |
Seal Expansion, Cutting, and Welding-(Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd) |
2 units | 2024.10 | Stainless Steel | Tube Replacement |
Cleaning, Roll Expansion, and Scraping(Hangzhou Chuangbo Machinery Equipment Co., Ltd) |
1 unit | 2024.9 | Copper | Tube Replacement |
Push-Pull Cleaning, Expansion, Cutting, and Weldin(Jiaxing Max Machinery Manufacturing Co., Ltd) |
2 units | 2024.8 | Stainless Steel | Tube Replacement |
Seal Expansion, Cutting, and Welding(Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd) |
1 unit | 2024.7 | Stainless Steel | Tube Replacement |
Seal Expansion, Cutting, and Welding(Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd) |
1 unit | 2024.6 | Stainless Steel | Tube Replacement |
Roll Expansion, Scraping, and Welding(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
2 units | 2024.4 | Stainless Steel | Tube Replacement |
Expansion(Jiaxing Max Machinery Manufacturing Co., Ltd) |
1 unit | 2024.5 | Copper | Tube Replacement |
Expansion, Cutting, and Welding – Intermediate Expansion Joint & End Plate Expansion Joint(Jiaxing Max Machinery Manufacturing Co., Ltd) |
2 units | 2024.3 | Stainless Steel | Tube Replacement |
Expansion, Cutting, and Welding(Jiaxing Max Machinery Manufacturing Co., Ltd) |
2 units | 2024.3 | Stainless Steel | Tube Replacement |
Mechanical seal liquid cooler strength expansion joint(Yantai Moon Pressure Vessel Co., Ltd) |
1 unit | 2024.4 | Stainless Steel |
Tube Replacement |
Roll Expansion, Scraping, and Welding(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
10 units | 2024.2 | Copper |
Tube Replacement |
Ningbo Yisheng Condenser Tube Replacement(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
1 unit | 2024.1 | Stainless Steel | Tube Replacement |
Push-pull cleaning, expansion cutting and welding (Zhejiang Hangzhen Intelligent Technology Co., Ltd) |
/ | 2023.10 | Stainless Steel | Tube Replacement |
Weiqiao Yidian Unit 1 (Shandong Weijian Construction Engineering Co., Ltd.) |
1 unit | 2023.8 | Copper/Stainless Steel | Tube Replacement |
Tube end expansion(Yantai Moon Pressure Vessel Co., Ltd.) |
4 units | 2023.7 | Stainless Steel | Tube Replacement |
Shop tube installation & expansion welding(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
8 units | 2023.6 | Copper | Tube Replacement |
Shanghai SECCO Tube Replacement(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
/ | 2023.6 | Copper | Tube Replacement |
Seal Expansion, Cutting, and Welding(Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd) |
2 units | 2023.3 | Stainless Steel | Tube Replacement |
Jiangsu Sierbang Heat Exchange Tube Replacement(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
/ | 2023.2 | Copper | Tube Replacement |
Shop tube installation & expansion welding(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
30 units | 2023.1 | Copper | Tube Replacement |
Condenser Process(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
11 units | 2023.1 | Copper | Tube Replacement |
expansion cutting and welding(Jiaxing Max Machinery Manufacturing Co., Ltd) |
2 units | 2022.12 | Stainless Steel | Tube Replacement |
Oil Cooler Expanding, Cutting & Welding (Ningbo Chuangli Hydraulic Machinery Manufacturing Co., Ltd.) |
1 unit
|
2022 .12
|
Stainless Steel |
Tube Replacement
|
Expansion cutting and welding(Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd) |
2 units | 2022.12 | Stainless Steel | Tube Replacement |
Expansion cutting and welding(Jiaxing Max Machinery Manufacturing Co., Ltd) |
1 unit | 2022.11 | Stainless Steel | Tube Replacement |
Push-pull cleaning, expansion cutting and welding(Zhejiang Hangzhen Intelligent Technology Co., Ltd) |
1 unit | 2022.10 | Titanium | Tube Replacement |
Nozzle Seal Welding + Strength Expansion Welding(Zhejiang Hangzhen Intelligent Technology Co., Ltd) |
1 unit | 2022.10 | Stainless Steel | Tube Replacement |
Expansion and cutting(Jiaxing Max Machinery Manufacturing Co., Ltd) |
1 unit | 2022.10 | Stainless Steel | Tube Replacement |
Expansion cutting and welding(Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd) |
1 unit | 2022.9 | Stainless Steel | Tube Replacement |
Push-pull cleaning, expansion cutting and welding(Zhejiang Hangzhen Intelligent Technology Co., Ltd) |
2 units | 2022.9 | Stainless Steel | Tube Replacement |
Expansion cutting and welding(Liyang Yuzheng Machinery Manufacturing Co., Ltd.) |
1 unit | 2022.9 | Stainless Steel | Tube Replacement |
Push-pull cleaning, expansion cutting and welding(Zhejiang Hangzhen Intelligent Technology Co., Ltd) |
2 units | 2022.8 | Titanium | Tube Replacement |
Push-pull cleaning, expansion cutting and welding(Zhejiang Hangzhen Intelligent Technology Co., Ltd) |
1 unit | 2022.7 | Titanium | Tube Replacement |
Nozzle Strength Expansion + Seal Welding (Ningbo Huayi Industry & Trade Co., Ltd.) |
1 unit | 2022.6 | Stainless Steel | Tube Replacement |
Ningbo Yisheng Tube Replacement Project(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
1 unit | 2022.6 | Copper | Tube Replacement |
Condenser Tube Replacement Project for Units 1 & 2 of Huji Power Plant (Binzhou Lvneng Thermal Power Co., Ltd.) |
2 units | 2022.5 | Stainless Steel | Tube Replacement |
Condenser Tube Replacement Project for Units 1, 2 & 3 of Yangxin Power Plant (Binzhou Lvtong Thermal Power Co., Ltd.) |
3 units | 2022.5 | Stainless Steel | Tube Replacement |
Expansion cutting and welding(Ningbo Hengfei Machinery Technology Manufacturing Co., Ltd) |
1 unit | 2022.5 | Stainless Steel | Tube Replacement |
Condenser Tube Sheet Installation & Welding for Units 1 & 2 of Huadu Project (China Energy Engineering Group Guangdong Thermal Power Engineering Co., Ltd.) | 2 units | 2022.3 | Stainless Steel | Installation of New Unit |
Shougang Changzhi Iron & Steel Co., Ltd. (Turbine Condenser Copper Tube Installation)
|
3 units
|
2022.3
|
Copper
|
Tube Replacement |
Condenser Tube Sheet Installation & Welding for Huadu Project Units (China Energy Engineering Group Guangdong Thermal Power Engineering Co., Ltd.)
|
2 units
|
2022.3
|
Stainless Steel
|
Tube Replacement
|
Expansion cutting and welding(Hangzhou Guoneng Turbine Engineering Co., Ltd) |
1 unit | 2022.1 | Copper | Tube Replacement |
Expansion cutting and welding(Changshu Antong Complete Machinery & Equipment Manufacturing Co., Ltd) |
2 units | 2022.1 | Stainless Steel | Tube Replacement |
Expansion cutting and welding(Ningbo Chuangli Hydraulic Machinery Manufacturing Co., Ltd) |
2 units | 2022.1 | Stainless Steel | Tube Replacement |
Condenser Tube Replacement Project, Tianjin(Hangzhou Guoneng Turbine Engineering Co., Ltd)
|
2 units | 2021.9 |
Titanium/Stainless Steel
|
Tube Replacement |
Condenser Tube Replacement - Jiaxing Pinghu(Hangzhou Guoneng Turbine Engineering Co., Ltd)
|
2 units | 2021.8 |
Titanium/Stainless Steel
|
Retrofitting and retubing
|
Titanium Tube Insertion, Push-Pull Cleaning, Expanding, Cutting & Welding for Lingang & Fengxian Projects (Shanghai Zhoule Shipbuilding Steel Structure Co., Ltd.)
|
2 units
|
2021.7
|
Titanium
|
New Equipment Installation for Samsung Project
|
Unit 2 Condenser Steam Side Cleaning, Titanium Tube Insertion, Push-Pull Cleaning & Expansion-Cutting-Welding at Fuzhou Luoyuan Bay (Harbin Shunyuan Power Plant Equipment Co., Ltd.)
|
3 units | 2021.6 | Titanium |
Tube Replacement
|
Inspection & Maintenance Project (Sinopec Shanghai Petrochemical Co., Ltd.)
|
2 units | 2021.5 | Copper | Tube Replacement |
On-site Condenser Installation at Jiangyin(Hangzhou Guoneng Turbine Engineering Co., Ltd)
|
2 × 350 MW units
|
2019.10
|
Stainless Steel
|
New Equipment Installation for Siemens Project |
On-site Condenser Installation for Shanxi Huairen Project(Dongfang Electric Corporation Dongfang Turbine Co., Ltd.)
|
High back pressure
|
2018.12 | Stainless Steel | Installation of New Unit |
On-site Condenser Installation for Huadian Junliangcheng Project(Dongfang Electric Corporation Dongfang Turbine Co., Ltd.)
|
350MW
|
2018.10
|
Stainless Steel | Installation of New Unit |
On-site Steam Turbine Condenser Installation for Units 1 & 2 of China Coal Datun Project(Dongfang Electric Corporation Dongfang Turbine Co., Ltd.)
|
2 × 350 MW units | 2018.12 | Stainless Steel | Installation of New Unit |
On-site Condenser Installation for Baotou Aluminum Project(Dongfang Electric Corporation Dongfang Turbine Co., Ltd.)
|
2 × 125 MW units | 2017.10 | Stainless Steel | Installation of New Unit |
On-site Condenser Installation for Xingneng Project(Dongfang Electric Corporation Dongfang Turbine Co., Ltd.)
|
5 units | 2017.10 | Stainless Steel | Installation of New Unit |
On-site Steam Turbine Condenser Installation for Units 1 & 2 of Shenhua Jiangyou Tianming Project(Dongfang Electric Corporation Dongfang Turbine Co., Ltd.)
|
2 × 1000 MW units
|
2017.11 | Stainless Steel | Installation of New Unit |
Piecemeal Replacement Project for Condenser Copper Tubes |
/ |
2017.12 |
Copper |
Tube Replacement |
Shanghai Baosteel Group Nanjing Meishan Power Generation Co., Ltd. |
/ |
2017.3 |
Copper |
Tube Replacement |
Shanxi Dongying Power Plant |
300MW |
2016.8 |
Copper |
Tube Replacement |
Unit 1 of Nanjing Meishan Energy |
50MW |
2014.6 |
Copper |
Tube Replacement |
Condenser Leakage Treatment for Unit 5 of Dezhou Power Plant |
700MW |
2014.2 |
Copper |
Gluing |
Nanjing Meishan Energy Co., Ltd. Project |
50MW |
2012.10 |
Copper |
Tube Replacement |
Unit 4 of Tianjin Dagang Guang'an Jinneng Power Generation Co., Ltd. |
200MW |
2012.7 |
Copper |
Tube Replacement |
Nanjing Meishan Energy Co., Ltd. Project |
50MW |
2012.3 |
Copper |
Tube Replacement |
Unit 3 of Tianjin Dagang Power Plant |
328.5MW |
2012.2 |
Copper |
Tube Replacement |
Nanjing Meishan Iron & Steel Co., Ltd. Thermal Power Plant |
50 MW |
2011.4 |
Copper |
Tube Replacement |
Shandong Baiyanghe Power Plant |
300MW |
2009.5 |
Stainless Steel |
Tube Replacement |
Unit 1 of Liaoning Yingkou Power Plant |
320MW |
2008.11 |
Copper |
Tube Replacement |
Huaneng International Dezhou Power Plant |
300MW |
2008.2 |
Copper |
Tube Replacement |
Yangzhou Wantou Power Plant |
200MW |
2007.11 |
Copper |
Tube Replacement |
Shandong Zhonghua Power Liaocheng Power Plant |
600MW |
2007.11 |
Copper |
Tube Replacement |
SEPCOIII Zhongtai Project Department |
135MW |
2007.11 |
Stainless Steel |
Tube Replacement |
Huaneng International Liaoning Yingkou Power Plant |
60MW |
2007.11 |
Copper |
Tube Replacement |
Shanxi Shentou Power Generation Co., Ltd. |
200MW |
2007.10 |
Copper |
Tube Replacement |
Zhenjiang Suyuan Jiandian Power Equipment Engineering Co., Ltd. |
2×60MW |
2007.9 |
Copper |
Tube Replacement |
Shanxi Shentou Power Generation Co., Ltd. |
200MW |
2007.4 |
Copper |
Tube Replacement |
Shandong Shenxian Yifa Thermal Power Plant |
12MW |
2007.3 |
Copper |
Tube Replacement |
Shandong Zouxian Power Plant |
300MW |
2007.3 |
Copper |
Tube Replacement |
Huaneng International Liaoning Yingkou Power Plant |
60MW |
2007.3 |
Stainless Steel |
Tube Replacement |
Shandong Zouxian Power Plant |
300MW |
2007.2 |
Copper |
Tube Replacement |
Chaoyang Hongwen Thermal Power Co., Ltd. |
6MW |
2007.2 |
Copper |
Tube Replacement |
Shanxi Shentou Power Generation Co., Ltd. |
220MW |
2007.1 |
Copper |
Tube Replacement |
Shandong Zhonghua Power Liaocheng Power Plant |
600MW |
2006.11 |
Copper |
Tube Replacement |
Zhenhai Refining & Chemical Maintenance & Installation Company |
Oil Cooler |
2006.10 |
Copper |
Tube Replacement |
Huaneng International Liaoning Yingkou Power Plant |
Auxiliary turbine |
2006.9 |
Stainless Steel |
Tube Replacement |
Huaneng International Power Co., Ltd. Dezhou Power Plant |
300MW |
2006.8 |
Copper |
Tube Replacement |
Unit 5 of Wuhan Iron & Steel Company |
25MW |
2006.7 |
Copper |
Tube Replacement |
Hubei Qingshan Thermal Power Plant |
50MW |
2006.6 |
Copper |
Tube Replacement |
Jiangsu Xinhai Power Generation Co., Ltd. |
200MW |
2006.5 |
Copper |
Tube Replacement |
Jiangsu Zhongtian Thermal Power Co., Ltd. |
50MW |
2006.5 |
Copper |
Tube Replacement |
Zhangjiagang Huayu Power Plant |
125MW |
2006.5 |
Copper |
Tube Replacement |
Jiangsu Jiangyuan Thermal Power Co., Ltd. |
6MW |
2006.4 |
Copper |
Tube Replacement |
Zhengzhou Xinli Electric Power Co., Ltd. |
200MW |
2006.4 |
Copper |
Tube Replacement |
Shandong Zouxian Power Plant |
300MW |
2006.4 |
Copper |
Tube Replacement |
Jiangsu Anbang Electrochemical Co., Ltd. |
15MW |
2006.3 |
Copper |
Tube Replacement |
Jiangsu Xinhai Power Generation Co., Ltd. |
200MW |
2006.3 |
Copper |
Tube Replacement |
Huaneng International Liaoning Yingkou Power Plant |
6MW |
2006.3 |
Copper |
Tube Replacement |
Shanghai Chongming Power Plant |
50MW |
2006.2 |
Copper |
Tube Replacement |
Zhangjiagang Huayu Power Plant |
125MW |
2005.12 |
Copper |
Tube Replacement |
Ningxia Daba Power Plant |
300MW |
2005.10 |
Stainless Steel |
Tube Replacement |
Yangluo Power Plant |
300MW |
2005.9 |
Stainless Steel |
Tube Replacement |
Shandong Linyi Power Plant |
125MW |
2005.9 |
Copper |
Tube Replacement |
Ningxia Daba Power Plant |
300MW |
2005.8 |
Stainless Steel |
Tube Replacement |
Huaneng Shandong Baiyanghe Power Plant |
125MW |
2005.7 |
Copper |
Tube Replacement |
Jiangsu Yangzi Petrochemical Olefins Plant |
Condenser |
2005.7 |
Copper |
Tube Replacement |
Guangdong Shaoguan Power Plant |
200MW |
2005.6 |
Stainless Steel |
Tube Replacement |
Wuhan Jingmen Refining & Chemical |
12MW |
2005.5 |
Copper |
Tube Replacement |
Yangluo Power Plant |
300MW |
2005.5 |
Stainless Steel |
Tube Replacement |
Shandong Baiyanghe Power Plant |
125MW |
2005.5 |
Copper |
Tube Replacement |
Shanghai Suoming Power Plant |
50MW |
2005.5 |
Copper |
Tube Replacement |
Tianjin Dagang Power Plant |
25OMW |
2005.4 |
Copper |
Tube Replacement |
Beijing Jingneng Co., Ltd. |
200MW |
2005.3 |
Copper |
Tube Replacement |
Shenyang Jinshan Power Plant |
12MW |
2005.3 |
Copper |
Tube Replacement |
Jiangsu Yancheng Power Plant |
135MW |
2005.2 |
Stainless Steel |
Tube Replacement |
Huainan Tianjia'an Power Plant |
125MW |
2005.2 |
Copper |
Tube Replacement |
Anhui Ma'anshan Power Plant |
125MW |
2005.1 |
Stainless Steel |
Tube Replacement |
Jiangsu Kangbi Power Plant |
2 × 6 MW units |
2004.12 |
Copper |
Tube Replacement |
Jiangsu Kangbi Power Plant |
300MKW |
2004.12 |
Copper |
Tube Replacement |
Tianjin Dagang Power Plant |
250MW |
2004.11 |
Copper |
Tube Replacement |
Jiangsu Kangbi Power Plant |
100MW |
2004.11 |
Copper |
Tube Replacement |
Anhui Ma'anshan Power Plant |
125MW |
2004.10 |
Copper |
Tube Replacement |
Beijing Jingneng Co., Ltd. |
200MW |
2004.9 |
Copper |
Tube Replacement |
Shanxi Shentou No.1 Power Plant |
200MW |
2004.9 |
Copper |
Tube Replacement |
Jiangyin Sulong Power Plant |
300MW |
2004.8 |
Stainless Steel |
Tube Replacement |
Lianyungang Xinhai Power Plant |
200MW |
2004.7 |
Copper |
Tube Replacement |
Guangxi Heshan Power Plant |
75MW×2 |
2004.7 |
Copper |
Tube Replacement |
Shanghai Accessories Factory |
2 × oil coolers |
2004.6 |
Copper |
Tube Replacement |
Jiangsu Jiangyin Xiagang Power Plant |
135MW |
2004.6 |
Copper |
Tube Replacement |
Pingdingshan Yaomeng Power Generation Co., Ltd. |
300MW |
2004.5 |
Copper |
Tube Replacement |
Lianyungang Xinhai Power Plant |
220MW |
2004.5 |
Copper |
Tube Replacement |
Jingdezhen Power Generation Co., Ltd. |
125MW |
2004.4 |
Copper |
Tube Replacement |
Jiangsu Kangbi Power Plant |
2 × 6 MW units |
2004.2 |
Copper |
Tube Replacement |
Jiangsu Kangbi Power Plant |
300MW |
2004.2 |
Copper |
Tube Replacement |
Shanghai Suoming Power Plant |
50MW |
2004.2 |
Copper |
Tube Replacement |
Jiangsu Jiangyin Xiagang Power Plant |
135MW |
2004.2 |
Copper |
Tube Replacement |
Guangdong Shaoguan Power Plant |
200MW |
2003.12 |
Stainless Steel |
Tube Replacement |
Jiangsu Yangzhou Power Generation Co., Ltd. |
200MW |
2003.12 |
Copper |
Tube Replacement |
Liaoning Jinzhou Donggang Power Plant |
200MW |
2003.11 |
Copper |
Tube Replacement |
Liaoning Jinzhou Donggang Power Plant |
200MW |
2003.10 |
Copper |
Tube Replacement |
Guangdong Shaoguan Power Plant |
125MW |
2003.8 |
Copper |
Tube Replacement and Tube Cleaning |
Unit 7 of Guangxi Taishan Power Plant |
100MW |
2003.9 |
Copper |
Tube Replacement |
Guangxi Laibin Power Plant |
125MW |
2009.9 |
Copper |
Tube Replacement |
Unit 8 of Guangxi Taishan Power Plant |
100MW |
2003.7 |
Copper |
Tube Replacement |
Unit 4 of Anhui Huainan Tianjia'an Power Plant |
300MW |
2003.5 |
Copper |
Tube Replacement |
Shandong Luneng Zhangqiu Power Plant |
135MW |
2003.5 |
Stainless Steel |
Tube Replacement |
Unit 4 of Wuhan Iron & Steel Company |
25MW |
2003.4 |
Copper |
Tube Replacement |
Henan Xinxiang Thermal Power Plant |
200MW |
2003.4 |
Stainless Steel |
Tube Replacement |
Unit 8 of Guangxi Taishan Power Plant |
100MW |
2003.2 |
Copper |
Tube Replacement |
Unit 3 of Henan Xinxing Thermal Power Plant |
200MW |
2002.10 |
Stainless Steel |
Tube Replacement |
Shandong Weifang Power Plant |
2 × Water Coolers for 300 MW |
2002.10 |
Copper |
Tube Replacement |
Unit 6 of Guangxi Taishan Power Plant |
100MW |
2002.7 |
Copper |
Tube Replacement |
Former Hanzhuang Power Plant |
3 × Oil cooler |
2002.6 |
Copper |
Tube Replacement |
Former Hanzhuang Power Plant |
25MW×2 |
2002.5 |
Copper |
Tube Replacement |
Unit 2 of Gansu Liancheng Power Plant |
100MW |
2002.3 |
Copper |
Tube Replacement |
Unit 2 of Henan Xinxing Thermal Power Plant |
200MW |
2001.11 |
Stainless Steel |
Tube Replacement |
Unit 1 of Gansu Liancheng Power Plant |
100MW |
2001.10 |
Copper |
Tube Replacement |
Guangxi Laibin Power Plant |
125MW |
2001.5 |
Copper |
Tube Replacement |
Unit 1 of Henan Xinxing Thermal Power Plant |
200MW |
2000.10 |
Stainless Steel |
Tube Replacement |
Xinjiang Hongyanchi Power Plant |
25MW |
2000.10 |
Copper |
Tube Replacement |
Jiayuguan Power Plant |
6MW |
1997.12 |
Copper |
Tube Replacement |
Shanghai Suoming Power Plant |
50MW |
1998.10 |
Copper |
Tube Replacement |
Shanghai Suoming Power Plant |
50MW |
1997.5 |
CopperTube Replacement |
Tube Replacement |
b.Modification
Project Name |
Installed Capacity |
Construction Period |
Tube Material |
Note |
Unit 2 of Zhangjiakou Power Plant |
300MW |
2013.10 |
Stainless Steel |
Modification |
Unit 11 of Jilin Longhua Power Plant |
200MW |
2013.10 |
Stainless Steel |
Modification |
Unit 2 of Qingdao Power Plant |
330MW |
2013.9 |
Titanium |
Modification |
Qilu Petrochemical Thermal Power Plant |
60MW |
2011.7 |
Stainless Steel |
Modification |
Unit 4 of Sinopec Qilu Branch Thermal Power Plant |
50MW |
2008.10 |
Stainless Steel |
Modification |
Unit 3 of Sinopec Qilu Branch Thermal Power Plant |
50MW |
2008.5 |
Stainless Steel |
Modification |
Unit 2 of Sinopec Qilu Branch Thermal Power Plant |
50MW |
2008.3 |
Stainless Steel |
Modification |
Jiangsu Xuzhou Maocun Power Plant |
200MW |
2007.12 |
Stainless Steel |
Modification |
Hebei Matou Power Plant |
200MW |
2007.10 |
Stainless Steel |
Modification |
Jiangxi Jiujiang Power Generation Co., Ltd. |
200MW |
2007.9 |
Stainless Steel |
Modification |
Liaoning Qinghe Power Generation Co., Ltd. |
200MW |
2007.8 |
Stainless Steel |
Modification |
Shandong Yankuang Nantun Power Plant |
2×50MW |
2007.7 |
Stainless Steel |
Modification |
Hunan Jinzhushan Power Generation Co., Ltd. |
125MW |
2007.5 |
Stainless Steel |
Modification |
Jiangxi Guixi Thermal Power Plant |
125MW |
2007.3 |
Stainless Steel |
Modification |
Datang Huainan Luohe Power Plant |
300MW |
2007.2 |
Stainless Steel |
Modification |
Unit 2 of Jiangsu Xuzhou Maocun Power Plant |
220MW |
2006.12 |
Stainless Steel |
Modification |
Datang Huainan Tianjia'an Power Plant |
125MW |
2006.12 |
Stainless Steel |
Modification |
Anhui Ma'anshan Power Plant |
125MW |
2006.2 |
Stainless Steel |
Modification |
Jiangsu Xuzhou Power Plant |
220MW |
2005.12 |
Stainless Steel |
Modification |
Jiangsu Qiaobi Power Plant |
300MW |
2005.10 |
Copper |
Modification |
Henan Jiaozuo Danhe Power Plant |
100MW |
2005.10 |
Stainless Steel |
Modification |
Liaoning Qinghe Power Plant |
110MW |
2005.5 |
Stainless Steel |
Modification |
Anhui Wuhu Power Plant |
135MW |
2005.3 |
Stainless Steel |
Modification |
c.Installation of New Unit
Project Name |
Installed Capacity |
Construction Period |
Tube Material |
Note |
Huangpu Power Plant Coal-fired Unit |
|
2018.7 |
Stainless Steel |
Tube Replacement |
On-site Condenser Installation for Huadian Junliangcheng Project |
1 unit |
2018.6 |
Stainless Steel |
Installation of New Unit |
On-site Steam Turbine Condenser Installation for Units 1 & 2 of China Coal Datun Project |
2 units (350MW) |
2018.4 |
Stainless Steel |
Installation of New Unit |
On-site Steam Turbine Condenser Installation for Units 1 & 2 of Shenhua Jiangyou Tianming Project |
2 units(1000MW) |
2017.9 |
Stainless Steel |
Installation of New Unit |
Push-Pull Cleaning, Expansion Cutting and Automatic TIG Welding for Stainless Steel Condenser Tubes |
/ |
2017.8 |
Stainless Steel |
Tube Replacement |
Qinhuangdao Hongxing Iron & Steel Co., Ltd. |
/ |
2017.5 |
Stainless Steel |
Tube Replacement |
Ningxia Power Plant |
1000MW |
2017.4 |
Stainless Steel |
Tube Replacement |
Hangzhou Guoneng Turbine Engineering Co., Ltd |
/ |
2017.3 |
Stainless Steel |
Tube Replacement |
Hangzhou Guoneng Turbine Engineering Co., Ltd |
/ |
2017.2 |
Stainless Steel |
Tube Replacement |
Project #2 of Jiangsu Yangzhou Power Generation Co., Ltd. |
630MW |
2017.1 |
Stainless Steel |
Tube Replacement |
Hangzhou Guoneng Turbine Engineering Co., Ltd |
100MW |
2016.10 |
Stainless Steel |
Tube Replacement |
Project #1 of Jiangsu Yangzhou Power Generation Co., Ltd. |
630MW |
2016.10 |
Stainless Steel |
Tube Replacement |
Datang Jiangyan Project |
50MW |
2016.9 |
Stainless Steel |
TIG welding |
Unit 2 of Guangxi Fangchenggang Power Plant |
600MW |
2016.5 |
Titanium |
Tube Replacement |
Unit 1 of Hebei Xingtai Power Plant |
300MW |
2016.6 |
Stainless Steel |
Tube Replacement |
Unit 2 of Hebei Xingtai Power Plant |
300MW |
2016.5 |
Stainless Steel |
Tube Replacement |
Unit 1 of Guangxi Fangchenggang Power Plant |
600MW |
2016.3 |
Titanium |
Tube Replacement |
Changshu High Pressure Vessel Manufacturing Co., Ltd. |
25 MW |
2016.1 |
Stainless Steel |
Tube Replacement |
Guangxi Qinzhou Port SDIC Power Plant |
1000MW |
2015.10 |
Titanium |
Tube Replacement |
Shanxi Xingneng Power Plant |
120MW |
2015.9 |
Stainless Steel |
Tube Replacement |
Unit 2 Project of Jiangsu Yixing Power Plant |
135MW |
2015.1 |
Stainless Steel |
Tube Replacement |
Unit 2 Condenser Project of Baosteel Zhanjiang (Guangdong) |
150MW |
2014.6 |
Titanium |
Tube Replacement |
Unit 1 Condenser Project of Zhanjiang |
150MW |
2014.5 |
Titanium |
Tube Replacement |
Unit 2 Cleaning, Expansion, and Cutting Project of Gaolan Port |
135MW |
2014.4 |
Titanium |
Tube Replacement |
Changshu High Pressure Vessel Manufacturing Co., Ltd. |
12MW |
2014.3 |
Stainless Steel |
Tube Replacement |
Nozzle Welding for Units 1 & 2 of Sichuan Dazhou Power Plant |
150MW |
2013.12 |
Stainless Steel |
Tube Replacement |
Unit 1 Installation of Zhuhai Gaolan Port Power Plant |
135MW |
2013.12 |
Titanium |
Tube Replacement |
3 Units of Shaanxi Yulin Future Energy Project |
150MW |
2013.9 |
Exhaust device |
Installation |
Unit 2 Installation of Zhuhai Hengqin Island Power Plant |
50MW |
2013.11 |
Titanium |
Tube Replacement |
Unit 1 Installation of Zhuhai Hengqin Island Power Plant |
50MW |
2013.7 |
Titanium |
Tube Replacement |
Shandong Linyi Power Plant |
330 MW |
2013.6 |
Stainless Steel |
Tube Replacement |
Hangzhou Xiasha Power Plant |
50MW |
2013.3 |
Stainless Steel |
Tube Replacement |
Wujiang Beiku Thermal Power Co., Ltd. |
50MW |
2013.3 |
Stainless Steel |
Tube Replacement |
Unit 2 of Nanjing Huaneng Jinling Power Plant |
50MW |
2013.1 |
Stainless Steel |
Tube Replacement |
Unit 1 of Nanjing Huaneng Jinling Power Plant |
50MW |
2012.11 |
Stainless Steel |
Tube Replacement |
Datang Thermal Power Welding Project |
50MW |
2012.10 |
Stainless Steel |
Tube Replacement |
Unit 2 of Guangdong Zhaoqing Dawang |
60MW |
2012.9 |
Stainless Steel |
Tube Replacement |
Changzhou Zhongtian Iron & Steel Thermal Power Plant |
50MW |
2012.8 |
Stainless Steel |
Tube Replacement |
Unit 6 Pipe Welding Project of Guangdong Meizhou Heshuyuan |
300MW |
2012.7 |
Stainless Steel |
Tube Replacement |
Baoqing Coal-fired Power Plant |
600MW |
2012.6 |
Stainless Steel |
Tube Replacement |
Unit 5 Pipe Welding Project of Guangdong Meizhou Heshuyuan |
300MW |
2012.4 |
Stainless Steel |
Tube Replacement |
Unit 2 of Sanshui Hengyi Power Plant |
600MW |
2011.5 |
Stainless Steel |
Tube Replacement |
Sheyang Port Project Department |
600MW |
2011.1 |
Titanium |
Tube Replacement Technical Guidance |
Unit 4 of Shanwei Power Plant Phase I |
660MW |
2010.12 |
Titanium |
Installation |
Fujian Yong'an Power Plant Project Department |
300MW |
2010.10 |
Stainless Steel |
Tube Replacement |
Unit 3 of Shanwei Power Plant Phase I |
660MW |
2010.7 |
Titanium |
Tube Replacement |
Yueyang Power Plant Project Department |
600MW |
2010.6 |
Titanium |
Tube Replacement |
Unit 6 Installation Project of Guangdong Thermal Power Engineering Corporation Yunfu Power Plant C Plant |
330MW |
2010.3 |
Stainless Steel |
Installation |
Unit 5 Installation Project of Guangdong Thermal Power Engineering Corporation Yunfu Power Plant C Plant |
330MW |
2009.11 |
Stainless Steel |
Tube Replacement |
Unit 2 of Yangcheng Power Plant |
150MW |
2009.10 |
Stainless Steel |
Tube Replacement |
Rizhao Power Plant |
600MW |
2009.10 |
Titanium |
TIG welding |
Phase I of Huizhou Daya Bay Thermal Power Plant |
330MW |
2009.8 |
Titanium |
Tube Replacement |
Unit 1 of Yangcheng Power Plant |
150MW |
2009.7 |
Stainless Steel |
Tube Replacement |
Shandong Baiyanghe Power Plant |
300MW |
2009.5 |
Stainless Steel |
Tube Replacement |
Unit 3 of Sanbaimen Power Plant |
1000MW |
2009.2 |
Titanium |
Tube Replacement |
Unit 2 of Fujian Putian Gas-fired Power Plant |
350MW |
2008.10 |
Titanium |
Tube Replacement |
Henan Kaifeng Jingyuan Power Plant |
600MW |
2008.9 |
Stainless Steel |
Tube Replacement |
Hebei Shijiazhuang Yuhua Power Plant |
300MW |
2008.8 |
Stainless Steel |
Tube Replacement |
Rizhao Project Department |
600MW |
2008.5 |
Titanium |
Tube Replacement |
Unit 1 of Fujian Putian Gas-fired Power Plant |
350MW |
2008.3 |
Titanium |
Tube Replacement |
Shandong Zhongtai Project Department |
135MW |
2007.11 |
Stainless Steel |
Tube Replacement |
Hunan Changsha Power Plant |
600MW |
2007.7 |
Stainless Steel |
Tube Replacement |
Zhejiang Yuhuan Power Plant |
1000MW |
2007.6 |
Titanium |
Tube Replacement |
Shanxi Yangcheng Power Plant |
600MW |
2007.3 |
Titanium |
Tube Replacement |
Shandong Huangdao Power Plant |
660MW |
2006.12 |
Titanium |
Tube Replacement |
Shandong Yunxian Power Plant |
1000MW |
2006.10 |
Stainless Steel |
Tube Replacement |
Huaneng International Liaoning Yingkou Power Plant |
小机 |
2006.9 |
Stainless Steel |
Tube Replacement |
Guangxi Qinzhou Power Plant |
600MW |
2006.9 |
Titanium |
Tube Replacement |
Chongqing Luozhen Power Plant |
600MW |
2006.8 |
Stainless Steel |
Tube Replacement |
Shandong Feixian Power Plant |
600MW |
2006.6 |
Stainless Steel |
Tube Replacement |
Shandong Penglai Power Plant |
300MW |
2006.5 |
Titanium |
Tube Replacement |
Shandong Liaocheng Power Plant |
300MW |
2006.5 |
Stainless Steel |
Tube Replacement |
Unit 2 of Shanxi Wangqu Power Plant |
600MW |
2006.2 |
Titanium |
Installation |
Shandong Huangdao Power Plant |
660MW |
2006.1 |
Titanium |
Installation |
Shandong Penglai Power Plant |
300MW |
2005.11 |
Titanium |
Installation |
Unit 1 of Shanxi Wangqu Power Plant |
600MW |
2005.11 |
Titanium |
Tube Replacement |
Shandong Liaocheng Power Plant |
300MW |
2005.10 |
Stainless Steel |
Installation |
Xiamen Songyu Power Plant |
300MW |
2005.8 |
Titanium |
Installation |
Henan Sanmenxia Power Plant |
135MW |
2005.5 |
Stainless Steel |
Installation |