a.Tube Removal
Project Name |
Installed Capacity |
Construction Period |
Tube Material |
Note |
Assembly of No.1 Condenser Shell for CGN Lufeng Project
(Harbin Turbine Company Limited)
|
1000MW | 2025.7 | Titanium Tube | Assembly |
Assembly of Condenser Shell for Unit 4, Changjiang Nuclear Power Plant
(Harbin Turbine Company Limited)
|
1000MW | 2025.1 | Titanium Tube | Assembly |
Tube Pulling for Low-Pressure Heater No.3, Changjiang (Hainan)(Harbin Turbine Company Limited) |
1 unit | 2024.12 | Stainless Steel | Tube Extraction |
MSR Sandblasting and Coating – Changjiang NPP, Hainan (Harbin Turbine Company Limited) |
/ | 2024.12 | Titanium Tube | Sandblasting and Painting |
MSR Sandblasting & Painting – Changjiang NPP (Hainan) |
/ | 2024.10 | Titanium Tube |
Sandblasting and Painting |
Tube Pulling in Yingcheng, Hubei(Harbin Turbine Company Limited) |
1 unit | 2024.9 | Copper Tube |
Tube Extraction |
MSR Sandblasting & Coating – Changjiang NPP |
/ | 2024.3 | Titanium Tube | Tube Replacement |
Shell Cleaning, Expansion, Cutting, and Welding at Sanmen |
/ | 2023.11 | Titanium Tube | Tube Replacement |
Lower Condenser Tube Expansion, Cutting & Welding – Haiyang Unit 3 (Harbin Turbine Company Limited)
|
1 unit | 2023.9 | Titanium Tube | Tube Replacement |
Haiyang Units 3 & 4 / Sanmen Units 3 & 4 (Harbin Turbine Company Limited) |
4 unit |
2023.8 | Titanium Tube | Tube Replacement |
Heat Transfer Tube Replacement – Emergency Diesel Generator Heat Exchanger, 122 Overhaul(Qinshan Nuclear Power Co., Ltd.) | / | 2023.4 | Copper Tube | Tube Replacement |
Intermediate Tube Sheet Grinding & Cleaning – Changjiang NPP Units 3 & 4 (Harbin Turbine Company Limited) |
2 unit | 2023.1 | Titanium Tube | Tube Replacement |
Changjiang Nuclear Power Project(Harbin Turbine Company Limited) |
2 unit | 2022.5 | Copper Tube | Tube Replacement |
Replacement of Titanium Tubes in RCW Heat Exchanger No. 4 for Unit 2, (Qinshan Third Nuclear Power Company Limited)
|
1 unit
|
2022.2
|
Copper Tube
|
Tube Replacement |
Heat Transfer Tube Replacement – Emergency Diesel Generator Heat Exchanger, 121 Overhaul, Qinshan Phase I(Qinshan Nuclear Power Co., Ltd.)
|
1 unit | 2022.2 | Copper Tube | Tube Replacement |
Emergency Diesel Generator Tube Replacement – Q1-0T120 Overhaul(Qinshan Nuclear Power Co., Ltd.)
|
6MW
|
2020.12
|
Copper Tube | Tube Replacement |
Heat Transfer Tube Maintenance – Emergency Diesel Generator Heat Exchanger, Q1-OT119 Overhaul(Qinshan Nuclear Power Co., Ltd.)
|
6MW | 2019.9 | Copper Tube | Tube Replacement |
Unit 4 Condenser Shell Assembly – Fangchenggang (Shanghai Electric Power Station Equipment Co., Ltd.)
|
1000 MW
|
2019.1
|
Titanium Tube
|
Installation of New Unit
|
(Qinshan Nuclear Power Co., Ltd.) |
/ |
2017.12 |
Copper Tube |
Tube Replacement |
Q1-OT116大修(Qinshan Nuclear Power Co., Ltd.) |
6MW |
2015.6 |
Copper Tube |
Tube Replacement |
R15大修(Qinshan Nuclear Power Co., Ltd.) |
30MW |
2014.5 |
Copper Tube |
Tube Replacement |
Tube Joint Welding – Units 1 & 2, Changjiang NPP, Hainan |
600MW |
2013.11 |
Titanium Tube |
Installation of New Unit |
Expansion, Cutting & Machining – Units 1 & 2, Changjiang NPP, Hainan |
600MW |
2013.1 |
Titanium Tube |
Installation of New Unit |
(Qinshan Nuclear Power Co., Ltd.) |
30MW |
2011.10 |
Copper Tube |
Tube Replacement |
Nanjing Baose Co., Ltd. |
Heat Exchanger |
2009.5 |
Titanium Tube |
Tube Replacement |
CNIC Fifth Construction Company |
Heat Exchanger |
2009.3 |
Copper Tube |
Tube Replacement |
Nanjing Baose Co., Ltd. |
Heat Exchanger |
2009.3 |
Titanium Tube |
Tube Replacement |
Qinshan Third Nuclear Power Company Limited |
Heat Exchanger |
2008.11 |
Titanium Tube |
Tube Replacement |
b.Modification
Project Name |
Installed Capacity |
Construction Period |
Tube Material |
Note |
Lakvijaya Power Plant, Sri Lanka |
300MW |
2015.7 |
Titanium Tube |
Modification |
c.Installation of New Equipment
Project Name |
Installed Capacity |
Construction Period |
Tube Material |
Note |
Unit 4 of Tianwan Nuclear Power Plant |
1000MW |
2016.6 |
Titanium Tube |
Installation of New Unit |
Unit 3 of Tianwan Nuclear Power Plant |
1000MW |
2015.6 |
Titanium Tube |
Installation of New Unit |
Vogtle Nuclear Power Plant, USA |
1000MW |
2012.12 |
Titanium Tube |
Installation of New Unit |
Haiyang Nuclear Power Plant Unit 1 |
1000MW |
2012.3 |
Titanium Tube |
Installation of New Unit |